www.factorybuysdirect.com
13
200245-01G
INSTALLATION
3. Attach gas line to fireplace gas regulator.
See
Connecting to Gas Supply
, page 14.
4. Check all gas connections for leaks. See
Checking Gas Connections
, page 16.
IMPORTANT: When finishing your firebox,
combustible materials such as wall board,
gypsum board, sheet rock, drywall, plywood,
etc, must have 1/2" clearance to the sides
and top of the firebox. Combustible materials
should never overlap the firebox front.
Figure 10 - Rough Opening for Corner
Installation
CAUTION: Do not operate
fireplace without hood in place.
1. Align 3 holes in upper side of hood with
holes in heat insulation board (see Fig-
ure 11).
2. Insert screwdriver through hole in top fire-
box panel to secure hood to heat insulation
board with 3 screws (see Figure 11).
INSTALLING HOOD
35"
28
1
/
8
"
39
3
/
4
"
56
1
/
4
"
Figure 11 - Hood Installation
Hood
Heat
Insulation
Board
Top of Firebox
Top
Firebox
Panel