background image

Installation and Operation of Flexible Batch Broiler – Electric

6

II. INSTALLATION INSTRUCTIONS

A.  QUALIFIED PERSONNEL

These installation instructions are for the use of 

qualified 

installation and service personnel only

. Installation or 

service by other than qualified personnel may result in 

damage to the broiler and/or injury to the operator.
Qualified installation personnel are those individuals, firms, 

companies or corporations which either in person or through 

an agent is engaged in and responsible for:
•  The installation of electrical wiring from the electric 

meter,  main  control  box  or  service  outlet  to  the 

electrical appliance. Qualified installation personnel 

must  be  familiar  with  all  precautions  required  and 

have complied with all requirements of state and local 

authorities having jurisdiction. See: National Electrical 

Code, ANSI/NFPA70.

•  This appliance is not intended for use by persons 

(including children) with reduced physical, sensory 

or  mental  capabilities,  or  lack  of  experience  and 

knowledge, unless they have been given supervision 

or instruction concerning use of the appliance by a 

person responsible for their safety.

B. DELIVERY AND INSPECTION

Duke Manufacturing Co. does everything within its power 

to insure you received your broiler in good condition. They 

are strapped down on heavy wooden skids and packed 

to prevent shipping damage. They have all been carefully 

inspected before they were packaged and consigned to 

the carrier.
Upon delivery of your Duke broiler:
•  Look over the shipping container, carefully noting any 

exterior damage on the delivery receipt, which must 

also be signed by the driver/ delivery person.

•  Unpack and check for any damage, which was not 

evident on the outside of the shipping container. 

•  Check for concealed damage. The carrier must be 

notified within fifteen (15) days of the delivery of the 

broiler and the carton, skid and all packaging materials 

must be retained for inspection.

Duke Manufacturing Co. cannot assume liability for loss 

or damage suffered in transit. The carrier assumes full 

responsibility for delivery in good order when the shipment 

was accepted. However, we are prepared to assist you 

in filing your claim.

Caution: The broiler is very heavy!  

Use adequate help when lifting.

1)   Using a utility knife, cut away plastic wrap (Not   shown).
2)   Remove the top cardboard and inner cap.
3)   Remove Training Material Box
4)   Remove cardboard from the corners (4 places).
5)   Remove cardboard on the ends (2 places).
6)   Remove  banding  straps  (Cut  with  utility  knife  or  scissors:  

5 places). 

7)   Remove box of attachable parts & accessories from the front. 
8)   Safely lift one end of broiler and tap block towards center and 

then sideways to remove. Repeat for remaining blocks. This 

allows casters to touch the pallet.

9)   Remove the broiler from the shipping pallet using 3 people 

to  guide  and  distribute  it’s  weight  (approx  335  lbs[152  Kg]) 
accordingly.  While carefully supporting the broiler. Roll it forward

 

until the front casters are clear of the pallet. Lift the broiler 6-8 

inches above and away from the pallet, and gently place on 

floor to avoid damage to casters.

10)   Remove  protective  blue  tape  from  broiler  panels,  double 

checking that no tape remains.

Содержание FBB-EC-208

Страница 1: ...ice this equipment This manual is Copyright 2014 Duke Manufacturing Co All rights reserved Reproduction without written permission is prohibited Duke is a registered trademark of the Duke Manufacturin...

Страница 2: ...Installation and Operation of Flexible Batch Broiler Electric 2...

Страница 3: ...5 0 Cancel a Cook Cycle 12 B 6 0 Checking the Broiler Temperature 12 B 7 0 Checking the Set Point Temperature 12 B 8 0 Shutdown the Broiler 12 C Cleaning 12 C 1 Four 4 Hour Cleaning 14 C 2 Daily Clea...

Страница 4: ...her flammable vapors or liquids in the vicinity of this or any other appliance Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the ins...

Страница 5: ...VAC 68A 60Hz 3Ph 23 500W FBB EC 230 230VAC 62A 60Hz 3Ph 23 500W FBB EO 230 230VAC 62A 60Hz 3Ph 23 500W FBB EC 240 240VAC 60A 60Hz 3Ph 23 500W FBB EO 240 240VAC 60A 60Hz 3Ph 23 500W A 1 0 Model Number...

Страница 6: ...r the shipping container carefully noting any exterior damage on the delivery receipt which must also be signed by the driver delivery person Unpack and check for any damage which was not evident on t...

Страница 7: ...ls Kit ITEM PART NAME PT NO 1 PRODUCT PAN SHELF 175353 2 DISCHARGE CHUTE 175340 3 DISCHARGE HOOD 175778 4 DISCHARGE PAN HOLDER 175358 5 DISCHARGE GREASE PAN 175357 6 V GREASE PAN 177011 7 MAIN GREASE...

Страница 8: ...ntilation air if the broiler is to operate properly This broiler should not be installed on a curb base or sealed to the wall Either condition can prevent proper ventilation of the unit Beforemakingan...

Страница 9: ...ectricalsupply When installing all broilers must be electrically grounded in accordance with local codes or in the absence of local codes with the National Electrical Code ANSI NFPA 70 in Canada CSA S...

Страница 10: ...calibrated prior to use A BROILER CONTROLS 1 Power Switch Turns the broiler ON or OFF 2 Product Selection Keys Selects the product recipe to run Also functions as number keys 1 8 in programming mode 3...

Страница 11: ...cycle B 2 0 Cook Product DO NOT LOAD IF LIGHT ON Broiler displays rdY and Cook light is not on Place holding pan at discharge Place product in front and back rows Load product Push forward as shown L...

Страница 12: ...Cancel a Cook Cycle Pressing and holding a product key for 3 seconds will cancel a cook cycle and discharge the product B 6 0 Checking the Broiler Temperature Pressing the key at any time other than i...

Страница 13: ...ARGE CHUTE DAILY CLEANING Remove and Wash Rinse Sanitize DISCHARGE PAN CAUTION HOT SURFACES WEAR INSULATED GLOVES WHILE CLEANING DISCHARGE HOOD X DISCHARGE GREASE PANS X MAIN GREASE PANS X DISCHARGE E...

Страница 14: ...t with food product must be cleaned and sanitized every 4 hours Loader and Carriage Remove loader from carriage and sanitize food contact areas Caution Hot surface near door Wear insulated gloves Disc...

Страница 15: ...eaning schedule 2 1 3 2 1 2 1 1 2 2 1 1 2 LOADER Slide out LOADER TRAY Dislodge and pull out MAIN GREASE PAN Slide out V GREASE PAN Slide out PHU PAN SHELF Slide up and out DISCHARGE HOOD Slide up and...

Страница 16: ...E PANEL Lift up slightly pull out panel bottom pull panel down to remove ASH SCRAPER Pull forward up and out GREASE DEFLECTOR Lift up and pull out INTERIOR SIDE COMPARTMENT Spray wipe cloth with degre...

Страница 17: ...pull up forward and out LOWER ELEMENT REFLECTOR Pull forward and out out HEATING ELEMENTS Use scraper end of cleaning tool to clean top and bottom of all heating elements INTERIOR COMPARTMENT Spray c...

Страница 18: ...t disconnect power to the broiler and allow to cool to room temperature Remove the catalyst guard and set aside for re installation after the catalyst has been cleaned B Handling catalyst Care should...

Страница 19: ...in the water a few times and then let it soak for 20 minutes Remove the catalyst and shake out the excess water Drain and clean the basin thoroughly and then repeat step 3 Remove the catalyst and rins...

Страница 20: ...D and all Product LED s will turn green Select a product key for a product that you wish to change The LED next to the selected product will turn green All other product LED will be blank D 3 1 Produc...

Страница 21: ...rature displayed between Fahrenheit F and Celsius C The and keys are used to scroll through the settings D 4 2 Change the Idle Temperature iSEt This is the set point temperature for the broiler during...

Страница 22: ...ements not heating properly Observe elements through discharge end of broiler Note Elements should glow orange in idle mode Grease pan is not installed Impedance pan or catalyst is not installed REMED...

Страница 23: ...l Replace heating element fuse if necessary Reinstall Panel Ensure that all vents are clear of obstructions Ensure that the cooling fan is running during broiler operation Cycle broiler off and back o...

Страница 24: ...Installation and Operation of Flexible Batch Broiler Electric 24 B USER REPLACEABLE HEATING ELEMENTS...

Страница 25: ...25 Installation and Operation of Flexible Batch Broiler Electric B USER REPLACEABLE HEATING ELEMENTS CONT D...

Страница 26: ...Installation and Operation of Flexible Batch Broiler Electric 26 B USER REPLACEABLE HEATING ELEMENTS CONT D...

Страница 27: ...27 Installation and Operation of Flexible Batch Broiler Electric B USER REPLACEABLE HEATING ELEMENTS CONT D...

Страница 28: ...600205 25 HEATING ELEMENT KIT 3300 W 1 TOP LEFT 240 VAC 600206 26 HEATING ELEMENT KIT 3300 W 2 TOP CENTER 208 VAC 600207 27 HEATING ELEMENT KIT 3300 W 2 TOP CENTER 230 VAC 600208 28 HEATING ELEMENT K...

Страница 29: ...7569 57 PROBE TEMP C CHAMBER 175977 58 RAMP LOADER 175741 59 RELAY SOLID STATE 10 AMP CONVEYOR 175870 60 RELAY SOLID STATE 50 AMP AC INPUT HEATING ELEMENT 177095 61 RELAY SOLID STATE 50 AMP DC INPUT H...

Страница 30: ...Installation and Operation of Flexible Batch Broiler Electric 30 VI WIRING SCHEMATICS...

Страница 31: ...31 Installation and Operation of Flexible Batch Broiler Electric...

Страница 32: ...Installation and Operation of Flexible Batch Broiler Electric 32 Duke Manufacturing Co 2305 N Broadway St Louis MO 63102 Phone 314 231 1130 Toll Free 1 800 735 3853 Fax 314 231 5074 www dukemfg com...

Отзывы: