![DryGair DG-X Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/drygair/dg-x/dg-x_installation-operation-and-maintenance-manual_2533277038.webp)
Unit Operation
Operating the Unit
DryGair Energies Ltd
.
32
6.3
Operating the Unit
Note
Inspect the unit before performing a first unit operation, verify that all
utilities are connected and that all the covers and doors are closed.
It is recommended that the first operation is performed by a qualified
DryGair person or representative.
Wait 2 hours after the machine is under voltage before operating
.
2.
Check to ensure the humidity set-points is set to the required values. The
humidity can be set through the remote control and the climate control
system (if applicable). See details in Appendix B.
Warning
Before turning on the unit, make sure the inside of the unit is clear from
any objects, and that there are no unauthorized people around the
machine.
3.
Press the On-Off
button on the remote control.
Note
If the operating mode is set to Local, the fan will start operating when the
unit is powered on.
4.
Check the following:
▪
The fan starts operating immediately (blowing air out of the unit).
▪
The air distributed by the unit blows over the top of the plants and
does not disturb the plants.
▪
The compressor is operating. It should start working about 5 minutes
after the unit starts operating, according to the controller set-pont.
5.
Wait 30 minutes from the unit operation and check to verify the coils are
fully wet and water is flowing from the unit
’s
drain.