![DryGair DG-X Скачать руководство пользователя страница 14](http://html.mh-extra.com/html/drygair/dg-x/dg-x_installation-operation-and-maintenance-manual_2533277014.webp)
Installation
Site Preparations
DryGair Energies Ltd
.
8
4.
INSTALLATION
The installation chapter includes site preparations, transporting and
unpacking instructions, and installation instructions.
Note
The site should be prepared based on the unit configuration and location
and should be done before unpacking and powering the unit on.
4.1
Site Preparations
4.1.1
Location Considerations
•
The DryGair unit should be installed indoors in a closed structure and
located in an accessible location for operation and maintenance.
•
The unit should preferably be positioned in the center of the room,
blowing air towards and above the plants (in 360 degrees).
•
If the unit is placed next to a wall, it should be noted that only the rear
side of the unit, without the coils, can be placed along the wall.
▪
Ensure the unit is distanced at least 50 cm (2 ft) from the wall and
blowing air towards the plants.
▪
Leave the rear panel of the distribution module connected and remove
the other panels according to the location of the plants.
•
The unit is shipped with two L-shaped metal rails that allow hanging the
unit above the floor from a concrete ceiling or construction.
•
The unit in its final position should be positioned at a height at which the
unit’s
fan is above the plants. The air should be distributed to the center
of the room.
•
If the plants growing method is high gutter, the unit should be elevated
and placed on a stably designed table at a height that enables the
efficient and safe operation of the unit.