![DryGair DG-X Скачать руководство пользователя страница 21](http://html.mh-extra.com/html/drygair/dg-x/dg-x_installation-operation-and-maintenance-manual_2533277021.webp)
DryGair Dehumidification Unit Model DG-X
Installation
Ver. 12/2020
15
4.4
Connecting the Hanging Rails
The DG-X unit is shipped with two L-shaped metal rails connected to the unit
with screws.
The rails can be used for hanging the unit from a concrete ceiling with a
threaded rod and should be connected to the bottom of the unit.
To connect the rails:
1.
Open the screws connecting the two rails to the corners of the unit.
Figure 4-3. Rails as shipped
2.
Lift the unit with a forklift and remove the three forklift addons (see
Figure 4-1 for reference) and the four leveling legs of the unit.
Note
When connecting the rails, pay attention to the difference between the
right and left rails, allowing the removal of the drain pan.
3.
Place the rails along the bottom sides of the unit and reconnect the legs,
so that the legs are connected to the unit through the rails.
Figure 4-4. Connected Rails
4.
Lower the unit.
Connected Rails