Copyright 2010 Baker Hughes Company.
English–PACE Indicators Instruction Manual | 23
Operation and Example Procedures
Figure
3
-
2: Q Code Visualization
3.5.4 Leak Testing Option
This task, measures the leak rate over the measure dwell time.
At the start of the test, the instrument measures the test pressure of the user system. The
instrument then records the pressure change during measure dwell time.
1
Runway on Earth’s surface.
2
29.9212
inHg (1013.25
hPa) datum.
3
Sea level reference datum (adjusted).
QNE
QNH
QFE
1
2
3
Содержание PACE1000
Страница 1: ...Druck com PACE Indicators Pressure Automated Calibration Equipment Instruction Manual...
Страница 2: ......
Страница 10: ...Copyright 2010 Baker Hughes Company viii PACE Indicators Instruction Manual English...
Страница 12: ...Copyright 2010 Baker Hughes Company 2 PACE Indicators Instruction Manual English Chapter 1 Description...
Страница 24: ...Copyright 2010 Baker Hughes Company 14 PACE Indicators Instruction Manual English Chapter 2 Installation...
Страница 29: ...Copyright 2010 Baker Hughes Company English PACE Indicators Instruction Manual 19 Data Logging...
Страница 30: ...Copyright 2010 Baker Hughes Company 20 PACE Indicators Instruction Manual English Chapter 3 Operation...
Страница 70: ...Copyright 2010 Baker Hughes Company 60 PACE Indicators Instruction Manual English Appendix B Air Density...
Страница 75: ......