Before fitting the mounting frame (D), first loosen the
front frame (E), by:
removing the 2 sheet metal screws (A), for the Colourline
or removing the bracket (B), for the Quadro.
Fix the mounting frame to the base set with the sheet
metal screws (C).
Now hang the front frame onto the mounting frame.
For the Colourline, hang one of the coloured sheets sup-
plied at the top and bottom (F).
Additional coloured sheets, available in 138 RAL colours,
can be ordered from your installer.
Your installer has a RAL fan with the entire range of avail-
able colours.
For safety reasons a guard should be placed in front of the
fire at all times.
Mounting the front panel Concerto (fig. 9a)
The coloured or stainless steel frame (A) is packed sepa-
rately from the basic set.The frame is fitted to the front
panel (B) using the 8 bolts supplied (C). Make sure that the
tall edge is at the bottom.
Positioning the logs
Position the logs as follows:
• Lay the large log against the back wall, on the log sup-
ports, as indicated in fig. 5.
• Fill the burner with vermiculite (this is in the plastic bag
with the log set).
• Spread it evenly over the burner tray and the surrounding
tray.
N.B.:
The fine substance may not be scattered on the
burner.
INSTRUCTIONS FOR INSTALLATION
16
fig. 9a
Hohe Rand
fig. 5