background image

15 

     

 

Graphic 1 

 
A- Minimum clearance required between the appliance and an unshielded combustible ceiling. 
B- 20 in. (500 mm) minimum; 
C- 1 in. (25 mm) minimum; 
D- Between 1 in. and 3 in. (25 mm and 75 mm); 
E- 3 in.(75 mm) minimum; 
F- 18 in. (457 mm) minimum. 
 
1- Shielding; 
2- Non-combustible spacers; 
3- Ceiling protector; 
4- Combustible wall; 
5- Ceiling; 
6- Appliance (side view); 
7- Appliance (top view). 

Содержание AUSTRAL NG1800

Страница 1: ...by STOVE BUILDER INTERNATIONAL INC 250 de Copenhague Saint Augustin de Desmaures Qu bec G3A 2H3 Tel 418 878 3040 Fax 418 878 3001 www drolet ca This manual is available for free download on the manuf...

Страница 2: ...IRST FIRES 28 IGNITION 28 HEATING 29 RELOADING 30 CREOSOTE FORMATION AND NEED FOR REMOVAL 30 USE OF THE BYPASS DAMPER 31 ASH DISPOSAL 32 FAN BLOWER OPERATION 32 MAINTENANCE 33 GLASS 33 GASKETING 33 PA...

Страница 3: ...operty damage bodily injury or even death Consult your municipal building department or fire officials about restrictions and installations requirements in your area and the need to obtain a permit Ke...

Страница 4: ...x D x H 23 3 4 x 35 x 31 1 4 603 x 889 x 794 mm 23 3 4 x 34 x 31 3 8 603 x 864 x 797 mm 23 3 4 x 34 x 30 3 8 603 x 864 x 772 mm 23 3 4 x 35 x 30 1 4 603 x 889 x 768 mm Combustion Chamber Baltic Myriad...

Страница 5: ...load of seasoned cordwood inserted inside the firebox The EPA output on the other hand is what has been obtained during emissions testing The EPA test procedure requires that a special type of wood be...

Страница 6: ...Use a chimney thermometer installed at a distance of approximately 18 inches on the flue pipe above the stove Flue gases should reach at least 350 F before you close the stove s primary air intake com...

Страница 7: ...o supplied screws 2 Slide the ash pan in position Side Panels and Ash Lip Installation 3 Start by fixing the front part of the decorative side in the two clips welded on the sides of the fire box 4 Th...

Страница 8: ...8 AUSTRAL LEGEND AND MYRIAD Ash Pan Installation...

Страница 9: ...justed periodically to provide an air tight fit To adjust Remove the lock pin spring pin by pulling and turning it using pliers wise grip Turn the handle counter clock wise one turn to increase pressu...

Страница 10: ...D TO DEPRIVE THE FIRE OF OXYGEN CALL THE FIRE DEPARTMENT DO NOT CONNECT TO ANY AIR DISTRIBUTION DUCT OR SYSTEM A SOURCE OF FRESH AIR INTO THE ROOM OR SPACE HEATED SHALL BE PROVIDED WHEN REQUIRED DO NO...

Страница 11: ...305 mm 9 229 mm 18 10 457 254 mm 21 533 mm 18 457mm 48 1220 mm 84 213 cm Legend 15 6 381 155 mm 12 305 mm 9 229 mm 18 10 457 254 mm 21 533 mm 18 457 mm 48 1220 mm 84 213 cm Myriad 15 7 381 178 mm 23...

Страница 12: ...12 FIGURE 1 3 Clearances to combustible materials and floor protection...

Страница 13: ...tove s required clearance if such clearance is smaller than 8 inches 203 mm Note 2 Only required under the horizontal section of the connector Must exceed each side of the connector by at least 2 inch...

Страница 14: ...iles or an equivalent non combustible material on fire proof supports spaced out at least 1 25 mm by non combustible spacers see graphic 3 50 33 Ceramic tiles or an equivalent non combustible material...

Страница 15: ...d combustible ceiling B 20 in 500 mm minimum C 1 in 25 mm minimum D Between 1 in and 3 in 25 mm and 75 mm E 3 in 75 mm minimum F 18 in 457 mm minimum 1 Shielding 2 Non combustible spacers 3 Ceiling pr...

Страница 16: ...3 A 1 in 25 mm minimum 1 Combustible wall 2 Non combustible spacers 3 Non combustible support 4 Ceramic tile or non combustible material _______________________________________________________________...

Страница 17: ...ombustible wall 2 Non combustible spacers 3 Brick __________________________________________________________________ Graphique 6 A 1 in 25 mm minimum 1 Combustible wall 2 Non combustible spacers 3 0 0...

Страница 18: ...the installation of your chimney 1 Do not connect this unit to a chimney flue serving another appliance 2 It must rise above the roof at least 3 0 9 mm from the uppermost point of contact 3 The chimne...

Страница 19: ...er foot with the upper end of the section toward the chimney See Figure 2 3 Detail B To insure a good draft the total horizontal length of the connector should never exceed 8 to 10 2 4 to 3 04 m In th...

Страница 20: ...tween the stove and chimney See figure 2 4 A The use of two 45 degree elbows See figure 2 4 C is often preferable to a single 90 degree elbow See figure 2 4 B because less turbulence is created in the...

Страница 21: ...pressure gauge the reading should be between 05 07 inches of water column w c at a medium high fire A draft measure of less than 03 w c will cause operational difficulties while too much draft greate...

Страница 22: ...22 TYPICAL INSTALLATIONS FACTORY BUILT CHIMNEY ROOF FLASHING 18 CLEARANCE WALL SUPPORT WALL RADIATION SHIELD RAIN CAP Wall installation CEILING SUPPORT RADIATION SHIELD Vertical installation...

Страница 23: ...t thimble or construct your own brick thimble If you are using a masonry chimney it is important that it be built in compliance with the specifications of the Building Code in your region It must norm...

Страница 24: ...24 FACTORY BUILT THIMBLE...

Страница 25: ...25 BRICK THIMBLE...

Страница 26: ...her heating appliances smell do not operate properly suffer smoke roll out when opened or back drafts occur whether or not there is combustion present 3 Opening a window slightly on a calm windless da...

Страница 27: ...he wood must have dried for 9 to 15 months such as the humidity content in weight is reduced below 20 of the weight of the log It is very important to keep in mind that even if the wood has been cut s...

Страница 28: ...u are overheating The smoke resulting from the paint curing process is not toxic IGNITION After making sure that the stove air intake controls are fully open completely pull out towards you place seve...

Страница 29: ...INING OF THE FIREBOX NEVER STORE WOOD WITHIN STOVE INSTALLATION CLEARANCES OR WITHIN THE SPACE REQUIRED FOR CHARGING AND ASH REMOVAL DO NOT BUILD THE FIRE TOO CLOSE TO THE GLASS BURNING SOLID FUELS GE...

Страница 30: ...r if not already included is highly recommended to maximize your unit s efficiency CREOSOTE FORMATION AND NEED FOR REMOVAL When wood is burned slowly it produces tar and other organic vapours which co...

Страница 31: ...mpletely and then open the bypass damper Wait for approximately 10 to 15 seconds and open the stove door Close the bypass damper when you are finished reloading Never leave the bypass damper open unde...

Страница 32: ...WITHOUT OPERATING THE STOVE THE ASH PAN CAN BECOME VERY HOT WEAR GLOVES TO PREVENT INJURY NEVER BURN THE STOVE WITH THE ASH TRAP OPEN THIS WOULD RESULT IN OVER FIRING THE STOVE DAMAGE TO THE STOVE AN...

Страница 33: ...sold The glass should be washed only when cold Under normal operating conditions the glass is designed to stay clean Glass cleaning may be required when burning damp wood Furthermore small creosote o...

Страница 34: ...or this purpose simply scrub the surface to be repainted with fine sand paper clean it properly and apply thin coats 2 of paint successively Refer to page 18 of the present manual for the paint curing...

Страница 35: ...35 BRICK LAYOUT ITEM PART DESCRIPTION QTY 1 29015 4 X 9 BRICK 21 2 PL36022 4 X 5 3 8 BRICK 1 3 PL36054 4 X 9 BRICK CUT 2 4 SE16059 ASH DUMP CAP 1...

Страница 36: ...nd labour costs covered by this warranty are limited according to the table below The manufacturer at its discretion may decide to repair or replace any part or unit after inspection and investigation...

Отзывы: