Steam from a boiler

Ultra-sorb panels for boiler steam have a threaded pipe nipple that 
extends outside the framework for a steam supply connection. The 
steam supply line should be dripped immediately ahead of the 
steam valve through a steam trap. 

Recommended drip trap type: 

(See Page 16 for trap dimensions)

Low pressure: Less than 15 psi — Float and Thermostatic (F&T) 
High pressure: More than 15 psi — Inverted Bucket  
Install wye strainer ahead of the steam valve.

Two ¾" (20 mm) F&T traps, one for each header, are required on 
the horizontal dispersion tube (Model LH) Ultra-sorb. One float 
and thermostatic trap is required on the lower header of the vertical 
tube (Model LV) Ultra-sorb.

1.  To ensure driest steam, take the humidifier steam supply off the 

top of the steam main (instead of side or bottom).

2.  An air flow proving switch is recommended to prevent the steam 

valve from opening if air is not moving in the duct.

3.  To prevent over saturation when duct air is cooler than 70 °F  

(21 °C), high limit (duct mounted) humidistat at least 15 feet 
(4.5 m) downstream and set at 80-90% is recommended.

4.  Steam from the dispersion tube tubelets must be discharged at 

right angles to the airstream for best non-wetting results.

P i p i n g

Figure 17-1:
Ultra-sorb strainer

Install strainer same size as 
valve and within 3" (1 m) 
of Ultra-sorb

Valve

Table 17-2:
O.D. of pipe and tubing

Nom. 

Dia.

Standard 

pipe

Tubing 

copper

Tubing 

SST

I.D. of 

hose

1¼"  

(30 mm)

1.660

1.375

-

-

1½"  

(38 mm)

1.900

1.625

1.500

1.50

2"  

(50 mm)

2.375

2.125

2.000

2.00

2½" 

(65 mm)

2.875

2.625

3.000

3.00

Note: 

Pipe thread and flange tubing adapters 

are available from DRI-STEEM.

From 

steam 

source

Table 17-1:  
Maximum steam carrying capacity and length of interconnecting vapor hose, tubing, and pipe*

Vapor hose

†††

Copper or stainless steel tubing  

and Schedule 40 steel pipe

Hose I.D.

Maximum capacity 

Maximum length**

Tube or pipe size***

Maximum capacity 

Maximum developed 

length

inches

DN

lbs/hr

kg/h

ft

m

inches

DN

lbs/hr

kg/h

ft

m

40

150

68

10

3

40

150

68

20

6

2

50

250

113

10

3

2

50

220

100

30

9

3

††

 80

††

450

204

80

24

4

††

 100

††

750

340

100

30

5

††

125

††

1400

635

100

30

6

††

150

††

2300

1043

100

30

  *  Based on total maximum pressure drop in hose, tubing, or piping of 5" wc (1244 Pa)
  **    Maximum recommended length for vapor hose is 10' (3 m). Longer distances can cause kinking or low spots.
 ***  To minimize loss of capacity and efficiency, insulate tubing and piping.
 

  Developed length equals measured length plus 50% of measured length to account for pipe fittings.

 

††

  Requires flange connection

 

†††

  When using vapor hose, use DRI-STEEM vapor hose for best results. Field-supplied hose may have shorter life and may cause foaming in the evaporating 

chamber resulting in condensate discharge at the dispersion assembly. Do not use vapor hose for outdoor applications.

US-IOM-0108.pdf   17

4/21/2010   11:34:58 AM

Содержание Ultra-sorb LH

Страница 1: ...on Tube Humidifier Panel Installation Operation and Maintenance Manual F o r a p p l i c a t i o n s u s i n g s t e a m f r o m a b o i l e r o r f r o m a n y D R I S T E E M s t e a m g e n e r a t i n g h u m i d i f i e r ...

Страница 2: ...ion Selecting the location 10 Determine humidifier placement 11 Installation in a cold air stream 12 Mounting in a horizontal duct 13 Mounting in a vertical duct 14 Installation inside an air handling unit 15 Supply and drain connections and dimensions 16 Piping 17 Mounting 19 Retrofitting an existing Ultra sorb 20 Performance data 22 Maintenance Maintenance 23 Troubleshooting guide 24 Replacement...

Страница 3: ...s across or under anything that could compress or damage the insulating material Compressed insulating material has a reduced R value Avoid bumping or snagging the PVDF insulating material Although PVDF is robust rough handling can cause tears which could negatively impact performance Before start up remove the clear poly film by tearing it along the perforation Do not use a knife or sharp object ...

Страница 4: ...the drain connection Arrange the components on a large flat working surface positioning them as indicated in Figure 4 1 condensate header to the left supply header to the right OM 238 1 Mounting flange Dispersion tube pipe thread coupling DN 20 drain connection Slip coupling without shoulder 20 nut 8 pipe thread coupling DN 20 drain connection Washer 8 20 nut 8 Slip coupling with shoulder Steam inl...

Страница 5: ...ings are factory lubricated if well aligned during insertion no further lubrication should be needed Push and twist the tube in until it bottoms out on the internal shoulder of the slip coupling see Figure 5 4 CAUTION Use care to avoid cutting the internal O rings of the slip couplings Dispersion tube Supply header assembly Slip coupling with shoulder OM 238 6 Shoulder O rings OM 239 20 bolts Moun...

Страница 6: ...sh and twist the slip couplings onto the condensate header Again care must be taken to avoid cutting the internal O rings Slide the slip couplings on until they bottom out against the stop disc on the condensate header The steam tubelets must be aimed so that they discharge the steam perpendicular to the airstream Rotate the dispersion tubes as needed After tightening the 20 bolts at all 4 corners...

Страница 7: ...in connection is to your left and orient the supply header assembly so the steam inlet nipple or tubing is to your right OM 260 1 Slip coupling with shoulder Supply header assembly Steam inlet Tubelet Dispersion tube Mounting flange 20 bolt 8 A A Washer 8 20 nut 8 Slip coupling without shoulder Condensate header assembly pipe thread coupling DN 20 drain connection Mounting flange Condensate drain Ta...

Страница 8: ...mbly The slip couplings are factory lubricated if well aligned during insertion no further lubrication should be needed Push and twist the tube in until it bottoms out on the inter nal shoulder of the slip coupling See Figure 8 3 CAUTION Use care to avoid cutting the internal O rings of the slip couplings OM 260 2 OM 260 3 20 bolt Washer and nut Mounting flange Steam inlet Steam inlet Slip coupling...

Страница 9: ...couplings onto the condensate header Again care must be taken to avoid cutting the internal O rings Slide the slip couplings on until they bottom out against the stop disc on the condensate header The tubelets must be aimed so that they discharge the steam perpendicular to the airstream Rotate the dispersion tubes as needed After tightening the 20 bolts at all 4 corners the Ultra sorb panel is rea...

Страница 10: ...ream B In general place the Ultra sorb panel where the air temperature is capable of absorbing steam being discharged without causing condensation at or after the unit This will normally be downstream of the heating coil or where the air temperature is warmest C Do not place the Ultra sorb panel in an outside air intake unless the air is tempered with a preheat coil D Do not place the Ultra sorb p...

Страница 11: ...ations in Figure 11 1 Dispersed steam must be absorbed into the airflow before it comes in contact with duct elbows fans vanes filters or any object that can cause condensation and dripping Placement in an air handling unit Location A is the best choice Installing downstream of heating and cooling coils provides laminar flow through the dispersion unit plus the heated air provides an environment f...

Страница 12: ...lvanized drip pan should be installed to prevent accidental spillage See Figure 12 3 Installation above valuable equipment Water piping and humidifiers should not be installed above expensive equipment A leaking water pipe condensation or other accidental water spillage could cause serious damage to the equipment below When such an installation cannot be avoided install a galvanized drip pan under...

Страница 13: ...x self drilling and tapping screw spacing not to exceed 12 305 mm If an angle iron frame is provided on the duct section a longer screw may be required Note To avoid puncturing the header screw penetration into the header enclosure should not exceed 20 mm Header support gasket secures header within enclosure Header enclosure 1 38 mm Mounting flange 1 38 mm Mounting flange Mounting flanges of duct are...

Страница 14: ...Ultra sorb flanges The recommended fastener is a 12 x self drilling and tapping screw spacing not to exceed 12 305 mm If an angle iron frame is provided on the duct section a longer screw may be required Note To avoid puncturing the header screw penetration into the header enclosure should not exceed 20 mm Air flow Condensate drain in dispersion tubes Air flow Condensate drain in header Steam inlet ...

Страница 15: ...6 150 mm On larger Ultra sorb installations vertical channels may be required on both the inlet and outlet ends of the humidifier to provide proper support See Figure 15 2 Air flow Mounting channel Typ Blank off plate Side blank off Steam supply header Additional mounting support channels required on larger Ultra sorb units Air handler casing Supply header Ultra sorb overall width Steam supply AHU ...

Страница 16: ...No Alternate method Drop 12 Drip 4 No Inverted bucket trap No No No No Stainless steel thermostatic trap No No No No Condensate to open drain Yes Yes Yes Yes Condensate return by condensate pump Yes Yes stainless steel pump recommended Yes Yes stainless steel pump recommended Condensate return to humidifier by gravity Yes Yes NA NA Condensate return to boiler via return line NA NA No No Provide 18 ...

Страница 17: ...7 1 Ultra sorb strainer Install strainer same size as valve and within 3 1 m of Ultra sorb Valve Table 17 2 O D of pipe and tubing Nom Dia Standard pipe Tubing copper Tubing SST I D of hose 1 30 mm 1 660 1 375 1 38 mm 1 900 1 625 1 500 1 50 2 50 mm 2 375 2 125 2 000 2 00 2 65 mm 2 875 2 625 3 000 3 00 Note Pipe thread and flange tubing adapters are available from DRI STEEM From steam source Table 1...

Страница 18: ...between the Ultra sorb and the vaporizing humidifier exceeds 20 feet 6 m consult the factory for special recommendations Thin wall tubing will heat up with less start up heat loss than heavy wall pipe Insulating the tubing or piping will reduce the loss in output caused by condensation in the tubing or piping Condensate Drainage Since Ultra sorb panels operate with virtually zero internal pressure...

Страница 19: ...k Before start up verify that all steam discharge tubelets are pointed perpendicular to the airstream see Figure 19 2 The slip couplings provide easy rotation of the dispersion tubes for proper tubelet orientation When removing and installing slip couplings verify that the O rings are seated in their grooves and lubricated When sliding the dispersion tube into the slip coupling be careful not to c...

Страница 20: ...pling off the supply header Before retrofitting an existing Ultra sorb panel with high efficiency tubes shut off steam to the system and let all hot surfaces cool See the Warning below Note Replacement slip couplings with internal O rings are shipped with retrofit high efficiency tube orders There are two types of slip couplings with shoulders and without Slip couplings with shoulders must go on t...

Страница 21: ...d 1 Slide the new slip couplings onto the high efficiency dispersion tube as shown 2 Push and twist the dispersion tube onto the supply header until the slip coupling shoulder bottoms out Connect the dispersion tube to the condensate header with the other slip coupling 3 Push the shoulderless slip coupling against the stop disc on the condensate header 4 Rotate the dispersion tube to point the tub...

Страница 22: ...result in nonuniform mixing of steam with air which may adversely affect the absorption distance 5 A small but measureable amount of duct air pressure loss will be present downstream from the Ultra sorb panel depending on air velocity tube spacing and whether the tubes are insulated See the pressure loss table at left NON WETTING DISTANCE IN INCHES 3 6 9 12 Figure 22 1 Ultra sorb non wetting dista...

Страница 23: ...ct annually to verify proper functioning with steam tight shut off O Rings slip couplings Inspect after two or three years of service replace if necessary High efficiency tubes If the insulating material gets torn repair the tear with our Insulating Material Repair Kit before dispersing steam or moving air through the air handler to prevent further damage This available kit uses tested and proven P...

Страница 24: ...ting of valve spring replace actuator or valve spring with one that is compatible with the higher steam pressure Valve installed backwards re install Adjust valve linkage Electric control system malfunctioning Calibrate or replace Faulty or inaccurately placed humidity controller Replace controller or relocate per catalog recommendations Poor location of control components Relocate per catalog rec...

Страница 25: ... Change transformer Incorrect control circuit voltage Replace component s to make all components compatible Incorrect control signal Replace components Improper wiring Rewire Incorrect humidity sensor Replace sensor Humidity controller out of calibration or malfunctioning Repair or replace Malfunctioning humidifier temperature switch not allowing humidifier valve to open Replace or readjust Pneumati...

Страница 26: ...ling without shoulder 1 38 mm 162727 001 5 O rings 300400 006 6 Supply header LH Consult factory 7 Return header LH Consult factory 8 Supply header LV Consult factory 9 Return header LV Consult factory 10 1 Drain tube LV Consult factory 12 Steam trap Consult factory 13 Hose cuff Consult factory 14 Hose clamp Consult factory 15 Steam valve Consult factory 16 Strainer Consult factory 17 Steam connec...

Страница 27: ...ce Manual Page 27 OM 207 OM 206 Figure 27 1 Ultra sorb Model LV Figure 27 2 Ultra sorb Model LH Replacement par t s Figure 27 3 Header evaporative humidifier 22 4 5 2 1 3 18 5 22 15 16 6 7 20 19 20 19 22 22 12 18 12 22 5 2 1 3 18 16 22 15 9 18 20 19 20 22 22 10 8 12 4 5 21 17 13 14 ...

Страница 28: ...dealing or of performance custom or usage of trade DRI STEEM SHALL NOT UNDER ANY CIRCUMSTANCES BE LIABLE FOR ANY DIRECT INDIRECT INCIDENTAL SPECIAL OR CONSEQUENTIAL DAMAGES INCLUDING BUT NOT LIMITED TO LOSS OF PROFITS REVENUE OR BUSINESS OR DAMAGE OR INJURY TO PERSONS OR PROPERTY IN ANY WAY RELATED TO THE MANUFACTURE OR THE USE OF ITS PRODUCTS The exclusion applies regardless of whether such damag...

Отзывы: