29
28
INSTALLING THE UNIT
-
STEP SEQUENCE -
Cut the fastener
Gypsum Board
Wood Panel
Wall Stud
1) MOUNTING THE UNIT ON THE WALL
If your Automatik system has a separated funnel, we suggest mounting it before the main body.
The illustrations will be shown with a standard unit but the step sequence remains the same.
• Undo the fastener securing the wall bracket and base at the back of the unit with cutting pliers.
• Attach the bracket to the wall with the 7 screws supplied with the unit.
If the wall includes wall studs covered with gypsum board,
we recommend
installing a wooden panel screwed to the wall studs beforehand
for more stability.
Suggest
ed dista
nce from t
he floor
Compac
t installa
tion: 50
” (125 c
m)
Installatio
n with t
he de
canter
Funnel: 4
0” (100 c
m)
Unit: 65
” (165 c
m)
• Lift the unit and slide its support onto the wall bracket.
Optimum efficiency
Not recommended
Each booster head can be installed according to the available space without compromising the height of the
head in relation to the unit.
However, we recommend that you
keep the number of joints (elbows) to a minimum
to optimize air
circulation and performance.
POSITIONING A BOOSTER HEAD
• If your unit is equipped with one or several booster heads, repeat the same steps to attach it, or them,
to the wall.
Not recommended
INSTALLING THE UNIT
-
STEP SEQUENCE -