Blow out the cylinder head and mounting holes for the
seal and nonreturn valves with dry, oilfree com
pressed air, and if necessary wipe off any adhering
sealing compounds with a clean cloth. If necessary,
also remove sealing compound from the balls 

(serial

no. 65 27 132) and springs 

(serial no. 65 27 131) of

the nonreturn valves (see figure 4).
Check the Orings 

7

 (serial number 65 27 119) of all

the valves and replace if necessary.

8

Carefully insert the complete nonreturn valves in their
previous mounting holes.

9

Place the cylinder heads on the table, with the mount
ing hole for the piston seal at the top. Centre the
mounting tool (serial number 65 27 117) with the mark
ing “T1757, THIS SIDE UP” on the top of the cylinder
head.

10

Insert a new piston seal 

(serial number 65 27 118),

with the open side (spring) facing down, in the conical
hole of the mounting tool, and press it evenly and
straight into the cylinder head using the previously re
moved pressure piece.

11

Check the piston play in the guide sleeve. To this end,
fully remove the pistons on each side of the pump,
while firmly holding the guide sleeve 

(serial no. 65 27

120) and pressure disk 

(serial no. 65 27 372). With

the plate firmly held, piston 

must have a maximum of

0.1 mm play in the sleeve. If the play is greater, both
parts must be replaced.

12

Check the piston for scratches and wear.

13

Clean the piston up to the retaining plate, removing any
adhered impurities.

 Keep free of oil and grease

.

14

Allow the piston to project the same length from the
pump sides, and carefully push the cylinder heads into
their original position above the pistons (

OUT 

must be

at the front in each case).

15

Tighten the cylinder head bolts with a torque wrench
(20 Nm or 175 in.lbs), working in diagonally opposed
sequence.

16

Connect the pipes and check for leaks.

17

Remount the thermostat.

18

Flush the system.

5.0

MAINTENANCE AND SERVICING

7

Продуйте головку цилиндра и монтажные отверстия
для уплотнителей и невозвратных клапанов сухим
безмасляным сжатым воздухом; при необходимости
сотрите чистой тканью любые следы герметиков. При
необходимости также удалите герметик с шариков 

5

(код заказа 65 27 132) и пружин 

(код заказа 65 27

131) невозвратных клапанов (см. рис 4).
Проверьте уплотнительные кольца 

(код заказа 65 27

119) всех клапанов и замените при необходимости.

8

Осторожно вставьте собранные невозвратные кла
паны в их прежние монтажные отверстия.

9

Поместите головки на стол, установочным отвер
стием для уплотнителя поршня наверх. Центрируй
те монтажный инструмент (код заказа 65 27 117)
маркировкой “T1757, THIS SIDE UP” поверх голов
ки цилиндра.

10

Вставьте новый уплотнитель поршня 

(код заказа

65 27 118) открытой стороной (пружиной) вниз, в
коническое отверстие монтажного инструмента, и
вдавите его равномерно и прямо в головку цилинд
ра, используя предварительно вынутую нагнета
тельную часть.

11

Проверьте зазор между поршнем и направляющей
гильзой. Для этого, полностью снимите поршни на
каждой стороне насоса, твердо удерживая направ
ляющую гильзу 

(код заказа 65 27 120) и упорную

шайбу 

(код заказа 65 27 372). Если твердо дер

жать пластину, то поршень 

должен иметь зазор в

гильзе не более 0.1 мм. При большем зазоре обе
части необходимо заменить.

12

Проверьте поршень на наличие царапин и призна
ков износа.

13

Очистите поршень до стопорной пластины; удалите
любые налипшие загрязнения. 

Сохраняйте его

свободным от смазки и масел

.

14

Позвольте поршням выступать на ту же длину по
сторонам насоса, и осторожно установите головки
цилиндров на их исходное положение над поршня
ми (в каждом случае 

OUT 

должно быть впереди).

15

Затяните болты головки цилиндра ключом с огра
ничением по крутящему моменту (20 Нм), пооче
редно по диагонали.

16

Подсоедините трубки и проверьте  утечки.

17

Установите на место термостат.

18

Продуйте систему.

5.0

ТЕХНИЧЕСКОЕ И СЕРВИСНОЕ
ОБСЛУЖИВАНИЕ

Содержание 65 26 802

Страница 1: ...1 D 00121427 Dr ger Oxygen Booster DOB M DOB T High pressure oxygen transfer pump Instructions for Use...

Страница 2: ...g operation 13 5 0 MAINTENANCE AND SERVICING 14 5 1 Servicing intervals 14 5 2 Maintenance and repairs 15 5 2 1 Check the safety valves drive components 15 5 2 2 Replacing the piston seals checking th...

Страница 3: ...f explosion hazard The device is not authorised for use in explosion hazard areas The following legislative provisions must be observed z Pressurised Container Order dated May 1989 15 21 26 27 28 30 3...

Страница 4: ...200 PN 300 10 4 1 PN 200 3 1 PN 300 50 PN 200 100 PN 300 200 DIN 477 G 3 4 300 Dr ger Oxy SR 400 50 440 60 3 x 230 50 60 High pressure oxygen transfer pump DR GER OXYGEN BOOSTER DOB M DOB T For trans...

Страница 5: ...ct the transfer pump from impurities and clean it when necessary Do not cover the ventilation slots at the front and rear with notice plates or similar parts Make sure that the moving parts of the pum...

Страница 6: ...lation airflow must be channelled from the front of the pump to the rear 3 0 INSTALLATION AND START UP 3 3 CEE 3 4 1 2 3 4 3 5 100 3 0 3 4 Preparing the device for operation 1 Connect the power plug t...

Страница 7: ...0 bar to the filler ter minal 1 Open any valve of the supply cylinder 2 Close overflow valve VO 3 Press the green button G switch on the transfer pump The green indicator LED lights up the pump is com...

Страница 8: ...intenance and repair operations Apply maximum pressure to the system Open all valves except pressure relief valve s VR Close supply valve s Open one pressure relief valve and close it carefully when t...

Страница 9: ...ing areas the particular dangers of handling compressed gases and oxygen the applicable safety regulations the action to be taken in the event of faults damage and accidents the handling of fire extin...

Страница 10: ...rder to make the fullest possible use of the oxygen supply and to avoid an excessive pressure difference when pumping i e increased pumping workload the transfer filling process consists of a combinat...

Страница 11: ...4 V1 4 0 4 2 3 Ending the filling process 1 Close the valves of the filled oxygen cylinders 2 Open the 200 bar relief valve until the pressure is re leased then close again 3 Unscrew the filled oxygen...

Страница 12: ...supply 1 has fallen to 10 bar supply 2 has fallen to 55 bar 4 0 OPERATION 1 10 2 55 1 10 200 2 2 1 10 2 10 200 140 7 4 2 200 10 2 4 0 When the pressure in supply 1 has fallen to 10 bar Never empty sup...

Страница 13: ...to flow back as far as possible into the sup ply cylinders 2 Open the pressure relief valve until the pressure in the transfer pump has dropped to about 10 bar All pressure gauges indicate the same pr...

Страница 14: ...actions are due Servicing must only be carried out by suitably trained ex perts We recommend that you take out a service contract with Dr gerService If not listed in the maintenance and repair operati...

Страница 15: ...AND SERVICING 100 200 20 200 6 TRG 402 9 2 01 82 DBA Dr ger 12 1000 5 Dr gerService 5 2 5 2 1 25 1 150 2 200 220 5 300 330 5 3 90 25 14 5 0 5 2 Maintenance and repairs 5 2 1 Check the safety valves d...

Страница 16: ...the 4 cylinder head bolts a f 11 or 7 16 per cylinder head 4 Carefully remove the cylinder head by hand and place it on a clean surface with the piston seal facing up wards 5 Remove the piston seal 1...

Страница 17: ...ead using the previously re moved pressure piece 11 Check the piston play in the guide sleeve To this end fully remove the pistons on each side of the pump while firmly holding the guide sleeve 2 seri...

Страница 18: ...k coloration If necessary replace the strainer inserts Order number D 02 316 spare part must be ordered 3 Check the condition of the seals and replace if neces sary For 200 and 150 bar filler ports G...

Страница 19: ...19 50 DOB 200 100 DOB 300 40 C 5 3 Dr gerService 5 0 5 0 MAINTENANCE AND SERVICING...

Страница 20: ...than 40 C Intake or pressure valve is sticking or worn Careful tapping with a hammer on the relevant valve housing generally frees the sticking valve balls If not Release the pressure from the pump R...

Страница 21: ...x 3 m Power plug CEE shrouded male connector 16 A 5 pin 400 V Motor 3 phase motor Rated power 1 1 kW Rated speed 1500 rpm Drive type Toothed belt Drive speed pump approx 600 rpm fan approx 2400 rpm Pu...

Страница 22: ...FLOW NL min INLET PRESSURE bar 300 Pump capacity at 300 bar filling end pressure 2 100 620 37 2 3 At 100 bar entrance pressure becomes a flooding service of Reached in 620 NL min 37 2 m 3 h overflow c...

Страница 23: ...23 6 2 DOB 200 DOB 300 3x230 400 N PE 50 6 2 Electrical wiring diagram DOB 200 DOB 300 3x230 V 400 V N PE 50 Hz Standard version 6 0 TECHNICAL DATA 6 0...

Страница 24: ...24 6 0 6 0 TECHNICAL DATA 6 3 Piping circuit diagram DOB M DOB T standard version 6 3 DOB M DOB T...

Страница 25: ...raeger Oxy SR on request Accessories High pressure hose Connecting hose between 200 bar sup ply cylinder and transfer pump Max operating pressure 220 bar 1 5 m long U 02 451 High pressure hose GA oxyg...

Страница 26: ...W 21 8 x 1 14 U 03 897 Filler hose GA oxygen outside Germany As per filler hose U 03 538 but Filler port connector W 21 8 x 1 14 internal manual connection Device cylinder connector W 21 8 x 1 14 int...

Страница 27: ...27...

Страница 28: ...use with any specific machine or device z y x FAX Dr ger Safety AG Co KGaA Germany Revalstra e 1 D 23560 L beck 49 451 8 82 0 26 80 70 49 451 8 82 20 80 http www draeger com z y x FAX Dr ger Safety A...

Отзывы: