30 / 64
Size
Minimum flow rate per pump
[l/h]
DPV 60
6100
DPV 85
8500
DPV 125
12500
6.3 Shutdown
6.3.1 Shutdown
Standard design
1. Set the master switch to 0.
Additional instruments
1. Set manual-0-automatic selector switch to 0.
6.3.2 Measures to be taken for shutdown
1
Fig. 6:
Venting and draining the accumulator
1
Vent plug
ü
The pressure booster system has been switched off. [
1. Loosen vent plug 1 at the accumulator.
ð
The pressure booster system is being vented and drained.
2. Re-tighten vent plug 1 on the accumulator.
Содержание Hydro-Unit Premium Line F
Страница 63: ......