![Dover Unified Brands Power Soak POWER PREP UNLIMITED Скачать руководство пользователя страница 7](http://html.mh-extra.com/html/dover/unified-brands-power-soak-power-prep-unlimited/unified-brands-power-soak-power-prep-unlimited_operators-manual_2524814007.webp)
7
OM-POWER PREP UNLIMITED
PUMP ASSEMBLY
HAZARDOUS VOLTAGE INSIDE. DISCONNECT POWER BEFORE SERVICING.
SERVICE BY TRAINED PERSONNEL ONLY.
KEEP FINGERS OUT OF PORTS.
1. Hold “D” Seal assembly in place
2. Install impeller retainer pin.
3. Hold “D” Seal assembly and install Face Plate onto shaft.
4. Slide on the impeller and push retainer pin over to one side to hold impeller in
place.
5. Align the pump casing to the gasket on the face plate. Feel behind the pump
casing to ensure the housing is seated evenly against the backing plate gasket.
6. Twist the pump so that the outlet is facing straight up, then install the quick clamp.
7. Hold 2” Gaskets into place and install the inlet pipe to the pump.
8. Install 2” quick (“LG” marking) clamps to secure intake piping.
GASKET
GASKET