![Dover PSG C100 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/dover/psg-c100/psg-c100_installation-operation-and-maintenance-manual_2525014013.webp)
ALF-13250-E-01
All-Flo
13
STEP 7
In order to remove both “Outer
Chambers”, using the 5/8 inch
wrench, remove the “Chamber
Clamps” from each side of the
“Intermediate”.
STEP 8
Remove both “Outer Chambers”
from the “Intermediate”.
STEP 9
Using two 1-1/8 Inch wrenches,
remove “Outer Diaphragm
Plate”, “Diaphragm” and “Inner
Diaphragm Plate” from one side
of the pump.
PUMP WET END ASSEMBLY
To assemble the wet end of the pump, reverse the order of disassembly.
Ensure all hardware is fastened in accordance with torque specifications
(see page 17). Inverting one of the diaphragms during reassembly will
facilitate ease of assembly.
When positioning band clamps use soapy water or a compatible lubricat-
ing spray on the inside of band clamps to aid assembly. Tap with a mallet
on the outside of clamp to help position the clamp while tightening the
fasteners. The band clamp fasteners and cap screws are stainless steel.
To prevent galling always apply an anti-seize compound to the thread.
Note: When using pumps built with PTFE O-Rings, always replace with
new PTFE O-Rings, since the original O-Rings may not reseal the pump.
STEP 10
Placing the 1-1/8 inch wrench on the remaining “Outer Diaphragm Plate” and the 7/16 inch wrench on the
“Diaphragm Rod Assembly”, remove the remaining “Outer Diaphragm Plate”, “Diaphragm” and “Inner
Diaphragm Plate” from the other side of the pump.
Содержание PSG C100
Страница 1: ...IOM INSTALLATION OPERATION MAINTENANCE C100 PLASTIC 1 INCH AIR OPERATED DOUBLE DIAPHRAGM PUMP ...
Страница 6: ...ALF 13250 E 01 All Flo 6 1 PUMP DIMENSIONS CLAMPED PLASTIC SECTION 4 ...
Страница 18: ...ALF 13250 E 01 All Flo 18 EXPLODED VIEW PARTS LIST C100 SP CLAMPED PLASTIC SECTION 8 ...
Страница 23: ...ALF 13250 E 01 All Flo 23 NOTES ...