Installation -6
Version 1.36
02/2004
4.
Connect the power cord.
Connect the power cord
6.
Press the on/stand-by button as illustrated to switch the machine on. The boiler is probably empty
when the machine is switched on for the first time, the heating element remains therefore off until the
boiler has been filled with water.
The indicator LED ‘Please wait, warming up’ (boiler temperature low indication) lights on and will thereafter
remain on until the operational temperature has been reached. This will take approx. 8 minutes for
220 V or up to 20 minutes for 110/120 V machines
Switch on the machine
5.
Install cup grille, drip tray and trough.
Inst
all drip tray
, cup grille and trough
The microprocessor will be initialized. This takes up to 30 seconds. During initialization all LED’s light
on.
Содержание Cafitesse 50
Страница 4: ...Version 1 36 02 2004 ...
Страница 20: ...Version 1 36 02 2004 ...
Страница 30: ...Version 1 36 02 2004 ...
Страница 38: ...Programming 8 Version 1 36 02 2004 4 3 Programming flow chart service device ...
Страница 56: ...Version 1 36 02 2004 ...
Страница 64: ...Version 1 36 02 2004 ...
Страница 78: ...Version 1 36 02 2004 ...
Страница 80: ......
Страница 94: ...Version 1 36 02 2004 ...
Страница 95: ...Version 1 36 02 2004 6 Preventive Maintenance Contents 02 2004 Not available ...
Страница 96: ...Version 1 36 02 2004 ...
Страница 102: ...Version 1 36 02 2004 ...
Страница 103: ...Version 1 36 02 2004 8 Service Information Bulletins Contents 02 2004 Not available ...
Страница 104: ...Version 1 36 02 2004 ...
Страница 105: ...Version 1 36 02 2004 9 Modification Instructions Contents 02 2004 Not available ...
Страница 106: ...Version 1 36 02 2004 ...