
Disassembly and Reassembly of Major Components
- 84 -
3.3.16. Spark plug
●
Put the spark plug hole of cylinder head
and after inserting the spark plug assem-
bly into it, tighten to assemble.
3.3.17. Rocker arm
●
Coat the push rod with engine oil and put
it into the push rod hole.
●
Position the rocker arm assembly on the
cylinder head and tighten the fixing bolts
to the specified tightening torque.
●
Adjust the valve clearance. Regarding
the adjustment, refer to the regular main-
tenance part.
3.3.18. Timing drive & sensor
●
Attach an O-ring to the cylinder block and
install the timing drive on the cylinder
block and then tighten the fixing bolts.
●
Install the timing sensor on the timing
drive and rotate (CW) the timing sensor.
(Be careful for sensor magnet not to be
broken)
EE3OM035
Torque
2.5 ~ 3.0
kg.m
EFM2091I
Torque
6.2
kg.m
EE3OM044
Timing drive
gear
Timing sensor
Timing drive
O-ring
Torque
6.5
kg.m
Содержание GV158TIC
Страница 1: ...950106 058010EN GV158TIC GV180TIC GV222TIC GAS GENERATOR ENGINE Operation Maintenance Manual...
Страница 2: ......
Страница 6: ...6 Engine Installation 143 6 1 Installing 143 6 2 Inspection Prior to Installation 144 Appendix...
Страница 130: ...Electrical equipment 124...
Страница 148: ...Maintenance of major parts 142...
Страница 152: ...Engine installation 146...
Страница 162: ...Appendix 156...