
Disassembly and assembly of major components
- 81 -
e) Assembling cylinder head
●
Clean the cylinder head thoroughly.
●
Coat the valve stems and valve guides with engine oil and assemble the valves.
●
Replace the valve stem seals with new ones and insert the stem seals to the valve guides of cylin-
der head with a special tool. (Be careful for the valve stem seals not to be damaged)
●
Install the valve spring washer to valve guide.
●
Put in the valve spring and then attach the valve spring plate on the springs.
Note :
Install the valve spring seat with
″
TOP
″
(Painted in Dual spring -
Yellow / Single spring - red) side up.
●
Pressing the spring down with a spe-
cial tool, assemble by inserting the
valve cotter.
●
After the valve is assembled, inspect
the valve tapping it lightly with an ure-
thane hammer if accurate assem-
bling was done.
EE1OM070
Painted portion
(Assemble spring
to the upper side)
EFM2040I
Содержание AD158TI
Страница 2: ......
Страница 16: ...Specification 10...
Страница 25: ...Commissioning and operation 19 2 Digital gauge panel Circuit diagram EDV2218035...
Страница 34: ...Commissioning and operation 28...
Страница 56: ...General information 50...
Страница 70: ...Main accessory parts 64...
Страница 120: ...Disassembly and assembly of major components 114...
Страница 172: ...Main parts maintenance 166...
Страница 187: ...Governor Actuator Controller...
Страница 188: ......
Страница 221: ...33 6 Product dimension 170 130 140 153 165 6 19 4 6 EDL11160004...
Страница 253: ...HY DP MANUAL 001 Digital Panel for Marine Engines Service Manual Ver 1 0 Doosan Infracore...
Страница 294: ......