background image

 6555-065-A-12-18

33

  Check the input LEDs. Any ON will hold the gate open and indicates a problem with a keying device.

  Check the external safety devices. Any activated will hold the gate open and indicates a problem with the safety device.

  Check the loop detectors. Any activated can hold the gate open and indicates a problem with loop detector or ground loop.

  Operator may be in a “soft shutdown.” Activate any keying device to determine if operator returns to normal operation.

  If automatic close is desired, be sure SW 1, switch 2 is ON and set timer open from 1-23 seconds.

  Bypass circuit board and check motor as above.

Gate opens but
will not close.

Gate closes but
will not open.

  Operator may be in a “soft shutdown.” Check input LEDs. If any are ON, momentarily disconnect, then re-connect the wire 

 

going to the respective terminal. Operator should open.

  Check to be sure that the operator is running in the proper direction.  Turn power OFF, and then back ON. Activate a keying 

 

device. Operator should run in the open direction. If operator runs in the close direction, turn power OFF and change direction 

 

switch SW 1, switch 1. Go to above section if operator now opens but will not close.

  Be sure that the each LED on the control board lights when the keying device connected to the that terminal is activated. If 

 

LED does not light, momentarily place a jumper wire from terminal 1 to the input terminal being checked. If LED lights and 

 

gate opens, problem is with the keying device. If LED does not light, replace control board.

  Bypass circuit board and check motor as described above.

Gate opens a short 
distance, then stops and 
reverses.

Gate closes then 
re-opens.

Gate starts to close, then 
reverses to open.

Operator runs for 1 
second and stops, two 
short chirps are heard.

Alarm chirps once every 
5 seconds. Operator will 
not run.

Alarm is sounding. 
Operator will not run.

Alarm sounds when 
power is applied and 
operator will not run.

  Operator has been in a “hard shutdown” condition in excess of 5 minutes. Reset button must be 

 

pushed to return operator to normal operation, see Section 6.2 Shutdown Conditions, page 32.

  The limit switch wire harness is not plugged into the circuit board. Check that the limit switch connector is properly plugged 

 

into the limit switch plug on the circuit board.

  There may be a problem with the current sensor on the circuit board. Replace the circuit board.

  Operator is in a “hard shutdown” condition. Reset button must be pushed to return operator to normal operation, see Section 

 

6.2 Shutdown Conditions, page 32.

  Check the gate and gate hardware for any binding, correct where necessary.

  Gate may be too heavy. 

  Check for any input or loop detector LED’s that are ON.

  Check that the operator is running in the proper direction (see “gate closes but will not open”).

Symptom

Possible Solution

(

s

)

  Check that AC power to the operator is turned ON.

  Transformer may be overheated. Turn power off and allow board to cool for several minutes then retest. Check for low VAC 

 

power and low voltage shorts.

  Check for VAC at high voltage input terminal. If voltage measures 0, check the incoming power wires or replace circuit board.

Operator will not run. 
Power LED is OFF.

Operator will not run. 
Power LED is ON.

  Insure that a minimum of one (1) external entrapment protection device is connected in EACH entrapment area and the 

 

inputs are connected and enabled (UL 325 DIP-switches are turned ON).

  If a photocell is used as a external entrapment prevention device, check to be sure that the beam is not blocked.

  Disconnect gate from the gate operator and check that the gate swings freely without any binding.

 

Bypass circuit board and Check Motor: 

Turn power switch 

OFF

 and remove the circuit board. Place a jumper wire from 

 terminal 

#18 to #17. 

CAUTION – HIGH VOLTAGE.

 Turn the power switch 

ON

. The motor should run. Turn the power switch 

 OFF

 and remove the jumper. With power switch still 

OFF

, place a jumper wire from terminal #18 to #16. 

CAUTION – HIGH 

 VOLTAGE.

 Turn the power switch 

ON

. The motor should run in the opposite direction. Turn the power switch 

OFF

 and 

 

remove the jumper.

  If the motor runs in both steps above, replace the control board. If the motor does not run, or runs in only one direction, 

 

problem can be a bad motor, motor capacitor, motor resistors, wire connections from the control board to the motor or a 

 

bad control board.

   Disconnect the gate from the gate operator and check that the gate swings freely without any binding.

  Re-adjust the reverse sensitivity.

 Continue 

troubleshooting.

  Re-adjust the reverse sensitivity.

  Disconnect the gate from the gate operator and check that the gate swings freely without any binding.

  Check the loop detector LEDs and input LEDs. Any that flash ON will cause the gate to reverse.

 Continue 

troubleshooting.

Operator will not run, 
entrapment protection 
input(s) LED is ON.

  The entrapment protection device is not connected or the wiring to it is open.

Operator will not run, 
entrapment protection 
input(s) LED is Blinking.

  The entrapment protection device has a fault or the wiring to it is shorted.

Operator has intermittent 
functionality problems 
that vary.

  The main terminal #3 250 mA power has been exceeded. Check total amp draw of connected device(s).

Содержание 6555

Страница 1: ...ided for the gate system where the risk of entrapment or obstruction exists The operator will NOT run without one or more monitored type B1 or B2 entrapment protection devices in EACH entrapment area...

Страница 2: ...OFF ON Internal alarm will NOT sound Internal alarm will sound before gate starts and throughout gate s cycle Auto close timer is OFF Manual input required to close gate Auto close timer is ON Adjusta...

Страница 3: ...port of the circuit board Main Terminal 3 Note Exceeding 250 mA of power from this terminal may cause the circuit board transformer to overheat causing intermittent problems QUICK GUIDE Terminal Desc...

Страница 4: ...trapment Protection Device Inherent Reverse Sensor System Type A External Entrapment Protection Device Inputs Connection inputs for Non contact Sensor Photo Sensor Type B1 Monitored Inputs Connection...

Страница 5: ...tection Wiring 4 4 Loop Detector Wiring SECTION 7 OWNER OF THE GATE OPERATOR 37 37 38 39 41 7 1 Alarm Sounding and Gate WILL NOT Operate 7 2 Manual Gate Operation 7 3 Gate Operators Monthly Checkup Pr...

Страница 6: ...tection is REQUIRED for this area B C B Closed Gate With the hinge mounted on the corner of the pilaster the entrapment area is eliminated and entrapment protection is NOT required for this area Close...

Страница 7: ...CLOSE Sensor Type B2 Reverse Loop Shadow Loop Automatic Exit Loop Minimizes the potential of the gate closing when a vehicle is present Number and placement of loops is dependent on the application R...

Страница 8: ...operator clutch pressure relief valve or reduce reversing sensitivity to compensate for a damaged gate For gate operators utilizing Type D protection 1 The gate operator controls must be placed so th...

Страница 9: ...s are installed a minimum distance of 6 feet away from the gate and gate operator or in such a way that a person cannot touch the gate or gate operator while using the device If access control devices...

Страница 10: ...ct closer than 16 inches 406 mm are not required to be provided with a means of entrapment protection Horizontal Slide Vertical Lift Vertical Pivot Swing Vertical Barrier Arm A B1 B2 or D A B1 B2 C or...

Страница 11: ...for vehicular traffic flow at entrances or exits to areas such as parking garages lots or toll areas VEHICULAR HORIZONTAL SLIDE GATE OPERATOR OR SYSTEM A vehicular gate operator or system that control...

Страница 12: ...5 safety and ASTM F2200 construction standards The proper installation of the vehicular swing gate operator is an extremely important and integral part of the overall access control system Check all l...

Страница 13: ...46 15 63 32 Min 52 25 34 46 15 43 63 37 Measured Length 2 24 67 88 86 26 Connecting Arm Drive Arm Drive Arm 67 88 2 33 94 round number up 34 inches Connecting Arm 86 26 33 94 52 32 round number down...

Страница 14: ...to the concrete pad using six 6 3 8 x 3 sleeve anchors not supplied 1 5 Securing Operator to Pad Sleeve Anchor Not supplied 3 8 208 230 460 Step Down Transformer Plate Remove breather pin from gear r...

Страница 15: ...elease hub with release tool DO NOT REMOVE HUB Bolt crank arm to operator Slide elbow assembly on crank arm Bolt control arm to gate bracket Slide control arm into elbow assembly KEEP ARM ASSEMBLY LEV...

Страница 16: ...King Swing Gate Operator is shipped with two warning signs The purpose of the warning sign is to alert uninformed persons and to remind persons familiar with the gate system that a possible hazard exi...

Страница 17: ...ection of photo sensors Type B1 and or reversing edges Type B2 entrapment protection required by UL 325 standards Entrapment Protection must be provided for the gate system where the risk of entrapmen...

Страница 18: ...ent or obstruction exists less than 16 from the open gate then entrapment protection is REQUIRED for this area OPTIONAL wireless transmitter can be used Receiver MUST monitor for the presence of the t...

Страница 19: ...Disconnect Switch Route incoming high voltage power through conduit and into the operator as shown Be sure wiring is installed in accordance with local codes Be sure to color code all wiring It is re...

Страница 20: ...ee page 20 Inherent Reverse Sensors Motor Plug P6 Self test when turned on SW 2 switch 1 CAUTION Do not run self test with the operator connected to the gate The drive chain MUST be disconnected befor...

Страница 21: ...und before gate starts and throughout gate s cycle Auto close timer is OFF Manual input required to close gate Auto close timer is ON Adjustable from 1 23 seconds to close gate 6 Relay activates and L...

Страница 22: ...is installed in the EXIT loop port of the circuit board Which must be installed for the OFF setting to function Switches 4 5 These work in conjunction with each other and determine when the relay on...

Страница 23: ...TOM Limit Bracket EXIT LOOP LMT LMT Opens Counter clockwise SW 1 1 ON 2 3 4 5 6 7 8 Switch 1 ON Opens Clockwise P2 Note If P2 plug is not connected to the circuit board and AC power is turned on alarm...

Страница 24: ...nsidered a turn The number of turns through the sensing coil is dependant on the operating voltage of the operator the speed of the gate and the weight of the gate In general light weight gates may re...

Страница 25: ...i ci an us e on ly MI N MA X MIN MAX Min Max Speed 3 6 Gate Speed Description and Adjustment Knob Adjustment The 6555 models are equipped with an AC module that allows you to adjust the speed of the g...

Страница 26: ...m a plug in loop detector installed in the EXIT loop port of the circuit board Main Terminal 3 Note Exceeding 250 mA of power from this terminal may cause the circuit board transformer to overheat cau...

Страница 27: ...use a separate power source 4 Opens gate P9 1 2 3 Main Terminal 3 Note Exceeding 250 mA of power from this terminal may cause the circuit board transformer to overheat causing intermittent problems O...

Страница 28: ...ONAL Expansion Kit sold separately will allow connection for additional devices 1 2 3 4 5 6 OPEN Beam STOP Switch 1 CLOSE Beam REVERSE Switch 2 OPEN Edge Beam REVERSE Switch 3 CLOSE Edge Beam REVERSE...

Страница 29: ...apment or obstruction exists less than 16 from the open gate then entrapment protection is REQUIRED for this area Receiver MUST monitor for the presence of the transmitter Type of wiring to be used on...

Страница 30: ...C NO DoorKing Plug In Single Channel Loop Detector 9410 DoorKing Plug In Dual Channel Loop Detector 9409 LOOP 1 LOOP 2 LOOP 1 To help protect the operator from accidentally closing on vehicles in the...

Страница 31: ...just and retest the gate operator properly can increase the risk of injury or death 5 Use the emergency release only when the gate is not moving and power has been shut off 6 KEEP GATES PROPERLY MAINT...

Страница 32: ...sensed by the inherent system the gate will reverse and run back to the closed position The time clock input is still present but the gate will not re open Example 2 If the gate is closing and an entr...

Страница 33: ...t loop Activation of a close command will run the gate to the closed position Before resetting a hard shutdown determine why the shutdown occurred Inspect the gate for any obstructions along its path...

Страница 34: ...nual Release Remove release tool and place where shown Release hub Gate can now be manually operated B C Unlock the cover and rotate sliding door A CAUTION DO NOT REMOVE HUB Never attempt to manually...

Страница 35: ...should be performed anytime a malfunction is observed or suspected High cycle usage may require more frequent service checks Operator Component Maintenance Monthly Interval 6 1 12 Alarm Arms Drive Be...

Страница 36: ...to the DoorKing Loop and Loop Detector Information Manual located on DoorKing s web site 4 Check to be sure that there are no shorted or open control wires from the keying devices to the gate operato...

Страница 37: ...Section 6 2 Shutdown Conditions page 32 Check the gate and gate hardware for any binding correct where necessary Gate may be too heavy Check for any input or loop detector LED s that are ON Check that...

Страница 38: ...Single channel detector with aux relay P N 9411 010 Single channel low power draw detector P N 9416 010 Dual channel low power draw detector P N 9415 010 External Loop Detector Reno A E 12 24 VDC or...

Страница 39: ...e TWO allen screws on bottom of hub to remove the complete hub assembly Limit Sensor Assemblies Loosen set screws on plastic limit assemblies to remove them Be CAREFUL not to damage limit sensor wires...

Страница 40: ...9 8 7 6 5 4 3 2 1 Board Ground 1 ft s 5 ft s 0 ft s 2 ft s 1 5 ft s Shield Orange Black Black Shield Orange Red Black Black Black Black Black NO Black Black Black Black Green Green NO White White Whi...

Страница 41: ...on again Note The owner of the gate operator is responsible for the KEY availability SECTION 7 OWNER OF THE GATE OPERATOR AC POWER OFF RESET Gate Operator is in a Hard Shutdown Condition when Alarm is...

Страница 42: ...the cover and power switch cover on this gate operator Please read SECTION 5 OPERATING INSTRUCTIONS for more information about operating this gate operator Note The owner of the gate operator is respo...

Страница 43: ...the gate will resume opening when the beam is clear If gate does NOT respond like it should in either direction of gate travel contact a trained service technician to make adjustments or repairs Test...

Страница 44: ...6555 065 A 12 18 40 This page intentionally left blank...

Страница 45: ...of the alarm cannot be corrected shut off power and DO NOT place this operator back into service until the malfunction can be identified and CORRECTED IMPORTANT Putting this gate operator back into s...

Страница 46: ...n exists The operator will NOT run without one or more monitored type B1 or B2 entrapment protection devices in EACH entrapment area UL 325 August 2018 Standard THIS PRODUCT IS TO BE INSTALLED AND SER...

Отзывы: