16
Installation, Operation and Maintenance Manual
Dalamatic Insertable Dust Collectors – Series DLM V
INSTALLATION
(
∆Ρ
connections)
On dust collectors fitted with an IPC (
∆Ρ
) Controller or Delta P-C01 Controller,
the cleanside and dirtyside tapping points require connecting using the
∆Ρ
connection kit supplied. The cleanside tapping point should be connected
to the manometer connection identified in figure 1. The dirtyside tapping point
should be connected as shown in figure 13.
Overload protection
All feeder circuits should be adequately protected with suitably-rated fuses and
contactors with integral overload protection.
Antistatic earthing
It is particularly important on collectors having
antistatic features and/or explosion stiffening, that the
earthing post (located adjacent to the symbol, shown
opposite) is properly connected to earth, using the
brass screw provided, to prevent any static build-up
(refer also to fig. 1).
Figure 13 Cleanside and dirtyside tapping point connections
Cleanside connection
(On dust collector casing)
Upward loop to help
prevent dust ingress
Dirtyside connection
(Customer to make provision for
fitment of dirtyside tapping point to
equipment – typically on the silo or
mounting flange)
To cleanside
connection on IPC
(
∆Ρ
) Controller or a Delta
P-C01 Controller
To dirtyside
connection on IPC
(
∆Ρ
In-line filter
(if have)
A
C
B
D
A
= 150 mm pitch centres
B
= 135 mm pitch centres
C
= 150 mm cutout
D
= 110 mm cutout
M8 bolt, nut
and washers
) Controller or
a Delta P-C01
Controller