Installation, Operation and Maintenance manual
7
PowerCore
®
Dust Collectors - Series CPV
INSTALLATION
1
11
10
9
8
7
6
2
3
4
5
1
Fan terminal box
2
Controller
3
Hinged access door
4
Lifting bracket
5
Mounting flange
6
Filter pack
7
Filter pack retainer
8
Compressed air inlet
9
Compressed air distribution manifold
10
Diaphragm valve
11
Fan motor
Figure 1: PowerCore dust collector (model CPV-6F illustrated)
Product information
Where equipment is installed in a Potentially Explosive Atmosphere, care
should be taken not to locate or use the collector where external ignition
sources can be introduced, for example stray electric currents, lightening,
electromagnetic waves, ionising radiation, ultrasonic waves.
When handling explosive or flammable materials and the risk of a fire is high,
then precautions such as fitting a sprinkler system and not locating the
collector in a zone 21/1 area should be considered.