RP_RPH Baghouse
27
If the collector was supplied with an electrical control panel, the wiring diagram supplied with the control panel takes
precedence over the general diagrams shown in this manual.
1. The gear reducer ships prefilled with lubricant. Remove the pipe plug and install the breather.
2. Remove the plastic exhaust-port plug from the bottom of the solenoid valve.
3. Wire the motor to a customer-supplied motor starter with overload and short circuit protection.
4. Remove all shipping restraints from manifold arms and shipping braces from the cleaning system and cleaning system
support frame.
Cleaning Mechanism Assembly and Adjustment
Electrical installation, service, or maintenance work must be performed by a qualified electrician and comply with all
applicable national and local codes.
Turn power off and lock out all power before performing service or maintenance work.
Do not install in classified hazardous atmospheres without an enclosure rated for the application.
Содержание RP Baghouse
Страница 22: ...22 Donaldson Company Inc Appendix A Installation...
Страница 44: ...44 Donaldson Company Inc Service Notes Date Service Performed Notes...
Страница 45: ...RP_RPH Baghouse 45 Date Service Performed Notes...
Страница 46: ...46 Donaldson Company Inc Service Notes Date Service Performed Notes...