Donaldson Torit Dalamatic DLMV 10/10 Скачать руководство пользователя страница 17

Dalamatic, DLMV

 14

Check Monthly
1.  Proper solenoid and diaphragm valve operation.
2.  If equipped,  check door seals for condition and 

contact. Replace or adjust as necessary.

3.  If equipped, check that the clean-air plenum is free 

of dust accumulation. If dust is present, check the 

surrounding filter bags for tears or loose seals.

Check Annually
Moisture Separator 

Isolate the compressed-air supply and remove and clean 

the filter.
Compressed-Air Manifold 

Isolate the compressed air supply, remove the drain plug 

and air inlet connections and clean thoroughly.
Filter Bags 

Remove one or two filter bags and inspect for general 

condition. Replace if necessary.
Jet Tubes 

Check that jet tubes are clean and the orifices are clear.

Maintenance Information

Instruct all personnel on safe use and maintenance 

procedures.

Use proper equipment and adopt 

all safety precautions needed for 

servicing equipment.  
Electrical service, or maintenance work must 

be performed by a qualified electrician and 

comply with all applicable national and local 

codes.
Turn power off and lock out electrical 

power sources before performing service or 

maintenance work.
Do not install in classified hazardous 

atmospheres without an enclosure rated for 

the application.
Turn compressed air supply OFF and bleed 

lines before performing service or maintenance 

work.

Do not set compressed-air 

pressure above 100-psig.  

Component damage can occur.
All compressed air components must be sized 

to meet the maximum system requirements of 

90-100 psig supply pressure.
The compressed-air supply must be oil 

and moisture free. Contamination in the 

compressed air used to clean filters will result 

in poor cleaning, cleaning valve failure, or poor 

collector performance.
Purge compressed air lines to remove debris 

before connecting to the unit’s compressed air 

manifold.

Operational Checklist

1.  Monitor the physical condition of the collector and 

repair or replace any damaged components. 

 

Routine inspections will minimize downtime and 

maintain optimum system performance. This 

is particularly important on continuous-duty 

applications. 

2.  Periodically check the compressed air components 

and replace compressed air filters.

 

Drain moisture following the manufacturer’s 

instructions. With the compressed air supply ON, 

check the cleaning valves, solenoid valves, and 

tubing for leaks. Replace as necessary. 

3.  Monitor pressure drop across filters.
 

Abnormal changes in pressure drop may indicate a 

change in operating conditions and possibly a fault 

to be corrected.  For example, prolonged lack of 

compressed air will cause an excess build-up of dust 

on the filters resulting in increased pressure drop. 

Cleaning off-line with no flow usually restores the 

filters to normal pressure drop.

4.  Monitor exhaust.
5.  Monitor dust disposal.

Содержание Dalamatic DLMV 10/10

Страница 1: ...operty of the owner Leave with the unit when set up and start up are complete Donaldson Company reserves the right to change design and specifications without prior notice Illustrations are for refere...

Страница 2: ...on assumes no responsibility or liability for the suitability of any fire and or explosion mitigation strategy or any items incorporated into a collector as part of an owner operators hazard mitigatio...

Страница 3: ...ded Use 1 Operation 3 Inspection on Arrival 4 Installation Codes and Procedures 4 Installation 4 Unit Location 5 Site Selection 5 Rigging Instructions 5 Hoisting Information 5 Typical Installation 6 S...

Страница 4: ...are pulse cleaned one at a time without turning the unit off Standard sizes range from 43 to 645 sq ft of filter area and feature either a Delta P or DeltaP Plus controller to control the filter clea...

Страница 5: ...g rating inches water gauge 20 Control power 120 Volt 50 60 Hz If unit was supplied with a Record Drawing the specifications on the drawing will supersede the standard specifications above Front View...

Страница 6: ...gh the filter As the compressed air enters the filter bag airflow is temporarily reversed and the bag inflates dislodging the dust cake formed on the outside of the bag The bag deflates and the dust c...

Страница 7: ...lector installation Collectors must be anchored in a manner consistent with local code requirements and anchors must be sufficient to support dead live seismic and other anticipated loads Consult a qu...

Страница 8: ...earance from heat sources and avoid any interference with utilities when selecting the location Portable units require special installation accommodations Note Units with explosion vents are not avail...

Страница 9: ...cess However if headroom is restricted they may be placed manifold down adjust chain or cable to lift unit level included angle of chain must not exceed 90 Four Point Lift for Vertical Installation pr...

Страница 10: ...e Install flat bar stiffeners if equipped See Optional Flat Bar Stiffener Installation 5 Secure with bolts washers and hex nuts supplied Tighten to form an airtight seal Filter Bag Installation 1 Remo...

Страница 11: ...DLMV 8 Jet Tube Installation Filter Bag Installation Clamps and Inserts jet tube insert header insert clamp seal frame recess for filter bag filter bag insert frame sealing ring sealing flange Filter...

Страница 12: ...ing to the unit s compressed air manifold Model Compressed Air Pressure Pulse Duration millisecond Pipe Diameter inches DLMV 4 7 6 10 and 9 15 65 psi 200 1 2 DLMV 7 7 10 10 and 15 15 65 psi 200 1 2 DL...

Страница 13: ...No 70 latest edition Check unit s rating plate for voltage and amperage ratings Refer to the wiring diagram for the number of wires required for main power wiring and remote wiring Using Existing Comp...

Страница 14: ...pressure setpoint The valves will continue to pulse until the low pressure setpoint is reached The solid state timer voltage must match the voltage of the rating of the timer provided typically 120VA...

Страница 15: ...105 135V 50 60Hz 1Ph Output Solenoids The load is carried and turned ON and OFF by the 200 watt maximum load per output solid state switch Pulse ON Time Factory set at 100 milliseconds or 1 10 second...

Страница 16: ...l electrical connections for tightness and contact 2 Check for proper rotation as noted on the fan housing To reverse rotation single phase power supply Follow manufacturer s instructions on the motor...

Страница 17: ...ore performing service or maintenance work Do not set compressed air pressure above 100 psig Component damage can occur All compressed air components must be sized to meet the maximum system requireme...

Страница 18: ...Repeat to install all bags 9 Replace jet tubes with the open end pressed firmly into its locator and the orifices directed toward the filter bag Filter Removal and Installation Use proper safety and p...

Страница 19: ...ed air components and replace compressed air filters 2 Drain moisture following the manufacturer s instructions 3 With the compressed air supply ON check the cleaning valves solenoid valves and tubing...

Страница 20: ...the dirty air plenum and the low pressure tap is located in the clean air plenum 1 Choose a convenient accessible location on or near the unit for mounting that provides the best visual advantage 2 Pl...

Страница 21: ...al pressure gauge and a pressure based switch The gauge function measures the pressure difference between the clean air and dirty air plenums and provides a visual display of filter condition The high...

Страница 22: ...of plastic tubing is supplied and must be cut in two sections Connect one section of tubing from the gauge s high pressure port to the pressure fitting located in the dirty air plenum Connect remainin...

Страница 23: ...e filters creating a pressure drop The Delta P Controller measures the pressure drop and provides a visual display in inches water gauge or metric SI units of daPa Filter Cleaning When the pressure dr...

Страница 24: ...lter Cleaning The Delta P Plus Controller offers three filter cleaning options 1 Differential Pressure Cleaning DFF When the pressure drop across the filters reaches the Controller s High Pressure On...

Страница 25: ...2 Loop grounding strap from seal frame to seal frame and fasten using existing hardware as shown 3 Connect a suitable ground wire to the grounding lug located on the side of the collector housing gro...

Страница 26: ...upied areas Explosion vents should be inspected regularly to confirm physical and operational condition Replace any damaged parts immediately Standard explosion vents are intended for outdoor installa...

Страница 27: ...f not illuminated check power supply and printed circuit board fuse If illuminated check that the interrupt function is not enabled If interrupt function is not enabled and still no pulse replace the...

Страница 28: ...25 Donaldson Company Inc Service Notes Date Service Performed Notes...

Страница 29: ...Dalamatic DLMV 26 Date Service Performed Notes...

Страница 30: ...27 Donaldson Company Inc Service Notes Date Service Performed Notes...

Страница 31: ......

Страница 32: ...any goods manufactured or supplied by others including electric motors fans and control components After Donaldson has been given adequate opportunity to remedy any defects in material or workmanship...

Отзывы: