5
3
INSTALLATION INSTRUCTIONS
The boiler must be installed by personnel authorised by the Department of Industry in accordance
with the applicable regulations and standards in force. However, the following recommendations
must be complied with when installing the boiler:
3.1
Location and assembly of the boiler/hot water tank unit
The boiler must be installed in a sufficiently ventilated site. The boiler has an integrated solar
capture system and must therefore be located at a lower level than the solar collector installation.
The two modules are to be placed back-to-back and aligned at the front. The assembly may be
made either towards the right or towards the left. Each module is supplied with levelling screws on
its base, accessible from the front, as shown in the picture below.
When you have correctly positioned the modules, interconnect them hydraulically using the two
flexible connection tubes supplied inside the boiler module. Open the door to access them.
Connect socket “A” on the rear of the accumulator module to the corresponding socket “A” of the
boiler module, and socket “B” to the corresponding socket “B”, as shown in the picture below.
Finally, connect the two modules electrically using the connectors on the rear of each module, as
shown in the picture below.
The boiler must be accessible from the side
for maintenance purposes. The solar accumulator
module may be placed on either side of the back-up boiler module for this purpose.
A
B
A
B
Electrical connection
Levelling bolts
Содержание Evolution Solar 30 HDX
Страница 1: ...INSTALLATION AND OPERATING INSTRUCTIONS EVOLUTION SOLAR HDX ER 0170 1996 CGM 04 392 ...
Страница 57: ...55 NOTES ...
Страница 58: ...Evolution EV FHDX 56 NOTES ...
Страница 59: ...57 NOTES ...