3
PLACE & LOCK CHUTE
TO BASE
4.
Place chute assembly on base.
5.
Rotate counterclockwise until chute
assembly clicks into the locked position.
ASSEMBLY
ASSEMBLE CHUTE
1.
Place bottom of gasket into the bottom cap.
2.
Carefully set the blade cone on the
gasket.
3.
Screw bottom cap into
the chute and blade cover.
Interlocking mechanism in base
prevents motor from running when
chute assembly is not in place.
ELECTRICAL REQUIREMENTS
1.
Power Switch
2.
Electrical Cord
Do not use an extension cord. If the
cord provided is too short, move the
appliance closer to an outlet. Place
bowl in front of unit underneath spout.
NOTE:
There is a top and bottom to the
gasket. The top measures 3-3/4 inches
and the bottom measures 4-1/4 inches.
The gasket fits snuggly in the bottom cap.
TOP 3-3/4”
9.5 cm
BOTTOM 4-1/4”
10.8 cm
Always insert gasket
into cap before
screwing cap into
the blade cover.
TOP 3-3/4”
9.5 cm
BOTTOM 4-1/4”
10.8 cm
1
2
www.yonanas.com
Содержание Yonanas
Страница 1: ...m m USER MANUAL MANUAL DO USU RIO...
Страница 11: ...9 www yonanas com...