background image

6

Apply RTV (not supplied) around each of the four housing 

bolt holes.

 This will prevent water from entering the bolt hole 

cavities. 

Insert the bolts, and torque to the values shown in Table 4.

NOTE: Follow all instructions and precautions shown by 

LOCTITE or the equivalent product’s manufacturer.

Wipe off any excess sealant and RTV/gasket material.

Table 4

RTL SLEEVOIL 

SIZE

 

PLUNGER SCREW 

HOUSING CAP BOLT

WRENCH SIZE 

(SOC. HEX) 

TORQUE 

(IN.-LB.) 

THREAD 

SIZE 

TORQUE 

(IN.-LB.) 

3-7/16

 3-15/16 

3/8 

3/8 

850 

850 

¾–10 

¾–10 

1920

1920 

4-7/16 

4-15/16 

½ 

5/8 

1260 

2500 

7/8–9 

7/8–9 

2280 

2280 

5 -7/16

5/8 

5/8 

2500 

2500 

1–8 

1–8 

2640 

2640 

5/8 

¾ 

2500 

3600 

1-1/8–7 

1-1/8–7 

3600 

3600 

10 

12 

¾ 

¾ 

¾ 

3600 

4800 

4800 

1¼–7 

1¼–7 

1½–6 

5040 

5040 

8880 

Plunger screw will be tightened to torque given in  Table 4, 
following procedure described below. 

Cap Loaded Bearings:

To install cap in cap loaded bearings, tighten plunger screw 
to torque given in Table 4 while shaft is held down. Mark the 
position of the plunger screw. Loosen plunger screw one turn 
and loosen shaft hold down.

Next, tighten plunger screw to the mark. Remove shaft hold 
down and tighten plunger screw locknut.

NOTE: Do NOT tighten plunger screw on accompanying 

base loaded bearing until cap loaded bearing has been 

installed and shaft hold down removed.

BASE LOADED BEARINGS

Tighten plunger screw to torque given in Table 4 and secure with 
locknut.

INSTALLATION OF GROMMETS

AND OIL GAUGE

Install grommet and grommet plate over coolant pipes. 

Apply RTV or a non-hardening sealant on the housing 

grommet area and between the grommet and grommet 

plates, and around coolant pipes.

NUTS

PLATES

BUSHINGS

GROMMET

Install bushings and nuts on pipes (snug not tight). 

Oil level gauge may be located any distance from the pillow block 
by use of a coupling and pipe of desired length. The extended 
pipe must be supported so that it remains straight and level with 
no offsets (use a spirit level—do not guess). Use pipe sealer on 
all connections.

When pillow block is arranged for circulating oil, the oil level 
is controlled by the drain system and the oil level gage is not 
needed

Содержание SLEEVOIL RTL 10

Страница 1: ...y qualified personnel who are familiar with the construction and operation of all equipment in the system and the potential hazards involved When risk to persons or property may be involved a holding...

Страница 2: ...les in the liner are aligned with the two thermocouple RTD holes in the housing Apply oil to the liner bearing surface NOTE Liner has been machined to close tolerances Scraping of bore is not necessar...

Страница 3: ...ty of the liner base INSTALLATION OF OIL RINGS NOTE Do NOT use oil rings if liner cap has baffles installed in the oil ring grooves Oil rings are shipped disassembled with two extra screws Place oil r...

Страница 4: ...NG If it ever becomes necessary to remove liner cap make certain that both upper thrust plate halves remain in place next to the thrust collar If a plate half should remain in the liner cap it can dro...

Страница 5: ...l other half of seal and tighten screws to torque given in Table 3 Check to make sure the seal will slide along the shaft with minimum effort to allow for shaft expansion Align the seal in the middle...

Страница 6: ...position of the plunger screw Loosen plunger screw one turn and loosen shaft hold down Next tighten plunger screw to the mark Remove shaft hold down and tighten plunger screw locknut NOTE Do NOT tigh...

Страница 7: ...e the probe tips contact the end of the drilled holes in the liner Use sealant on all threaded connections Check construction drawings to determine if coolant water or air is to be supplied to the bea...

Страница 8: ...cosity is determined by the equipment manufacturer and normally specified on the construction drawing Information regarding qualities and properties of specific oils should be referred to the lubrican...

Страница 9: ...temperatures can be as harmful to the bearing as high temperatures The Dodge heater thermostat combo can be used in these low ambient conditions The Dodge heater thermostat combo turns on at 70 F and...

Страница 10: ...135290 135291 135292 135293 135294 135295 135296 135297 135298 135299 135135 36 38 RTL Seal Kit Clamp Seal Assembly O Ring 2 2 2 435001 435002 435003 435004 435005 435006 435007 435008 435009 435010...

Страница 11: ...ld cuttable stainless steel probe a platinum sensing element and a spring loaded fitting with an oil seal COOL LUBE 2 All the features of the OLF 2 system plus a built in heat exchanger for continuous...

Страница 12: ...Dodge Industrial Inc 1061 Holland Road Simpsonville SC 29681 1 864 297 4800 All Rights Reserved Printed in USA MN3060 02 22 3060 0222 DODGE INDUSTRIAL INC AN RBC BEARINGS COMPANY...

Отзывы: