CAUTION: Water pressure should never exceed 120 P.S.I.

FLUID INLET

CROSSOVER PIPE OR HOSE CAN
BE OF REDUCED SIZE

AIR INLETS

AIR OUTLETS

DRAIN

AIR COOLING

FLUID COOLING

NOTE: If coolant temperature can fluctuate below 70°F 

during low ambient conditions, then an oil sump heater/ 

thermostat should be installed to ensure proper oil 

temperature is maintained.

CAUTION: Do not stand on water pipes. 

Remove and reinstall,using sealer, all pipe plugs not 

previously removed.

Prior to placing the bearings into operation check for cooling 
pipe leaks by placing the cooling water system into operation 
at normal operating pressure and flow rate. If a leak is detected, 
remove and reinstall the coolant pipes with pipe sealant, and 
check again.

When using air as the cooling medium, connect an inlet to each 
pipe on one side of the bearing and an outlet to the pipes on the 
other side Adjust flow to rate specified on construction drawing 
or to suit conditions.

Other Accessories/Options Available:

• 

Combination Heater/Thermostat Assembly

• 

Oil Sump Thermometer

• 

Auxiliary Seal Kit

• 

Isolator Seal Kit

• 

End Cap Kit

• 

Vibration Detector Mounting Kit

• 

Coolant Hose Kit

• 

RTD Kit

• 

OLF-2

• 

Cool Lube 2

LUBRICATION AND OPERATION

Since the satisfactory operation of the pillow block depends 
almost entirely on the oil film being maintained between the 
shaft and bearing liner surface, the use of a high quality oil from 
a reputable manufacturer is recommended. Use a high grade 
straight mineral oil with rust and oxidation (R & O) inhibitors and 
anti-foam agents. Check construction drawings or equipment 
instruction manual for proper oil. Oil viscosity is determined 
by the equipment manufacturer and normally specified on 
the construction drawing. Information regarding qualities and 
properties of specific oils should be referred to the lubricant 
manufacturer.

If bearings do not have circulating oil, fill pillow block with oil to 
top of center circle in the oil gauge.  

After placing into operation remove  inspection covers and check 
to make sure oil rings are bringing up oil. Operation should be 
checked frequently during  the first few days.

IMPORTANT: Check and re-torque plunger screw to the 

specified torque after 24 hours or initial start-up and then 

check periodically as required. 

Table 6

RTL SLEEVOIL 

Size 

Oil Volume *†  

Fluid Ounces 

Approx. 

Quarts Approx. 

Liters Approx. 

3 7/16

 56 

1.75 

1.66 

315/16

 64 

1.89 

4 7/16

 80 

2.5 

2.37 

415/16

 128 

3.79 

5 7/16

 152 

4.75 

4.49 

224 

6.62 

336 

10.5 

9.94 

416 

13 

12.30 

608 

19 

17.98 

10 

896 

28 

26.50 

12 

1440 

45 

42.59 

* Volume of oil required to fill pillow block to top of CENTER CIRCLE of oil gauge. 

† 32 fluid ounces = 1 quart = 0.946 Liters

If noise develops, check alignment of housing, plunger screw 
and all operating parts. Check all points and re-torque bolts 
and plunger screws after several days operation. Maintain oil 
level between top and midpoint of the oil level gauge at all times 
while unit is in operation. Oil will leak out of the shaft seals if the 
bearings are overfilled with oil.

NOTE: Bearings should NOT be stored outdoors before 

installation. For extended or outdoor storage, contact 

equipment manufacturer for special storage instructions.

NOTE: Bearings (and shafts) allowed to set idle for extended 

periods after being run MUST be protected against 

corrosion. If the unit can not be run for several minutes at 

least once a week, consult equipment manufacturer for 

special lubrication instructions.

Содержание SLEEVOIL RTL 10

Страница 1: ...y qualified personnel who are familiar with the construction and operation of all equipment in the system and the potential hazards involved When risk to persons or property may be involved a holding...

Страница 2: ...les in the liner are aligned with the two thermocouple RTD holes in the housing Apply oil to the liner bearing surface NOTE Liner has been machined to close tolerances Scraping of bore is not necessar...

Страница 3: ...ty of the liner base INSTALLATION OF OIL RINGS NOTE Do NOT use oil rings if liner cap has baffles installed in the oil ring grooves Oil rings are shipped disassembled with two extra screws Place oil r...

Страница 4: ...NG If it ever becomes necessary to remove liner cap make certain that both upper thrust plate halves remain in place next to the thrust collar If a plate half should remain in the liner cap it can dro...

Страница 5: ...l other half of seal and tighten screws to torque given in Table 3 Check to make sure the seal will slide along the shaft with minimum effort to allow for shaft expansion Align the seal in the middle...

Страница 6: ...position of the plunger screw Loosen plunger screw one turn and loosen shaft hold down Next tighten plunger screw to the mark Remove shaft hold down and tighten plunger screw locknut NOTE Do NOT tigh...

Страница 7: ...e the probe tips contact the end of the drilled holes in the liner Use sealant on all threaded connections Check construction drawings to determine if coolant water or air is to be supplied to the bea...

Страница 8: ...cosity is determined by the equipment manufacturer and normally specified on the construction drawing Information regarding qualities and properties of specific oils should be referred to the lubrican...

Страница 9: ...temperatures can be as harmful to the bearing as high temperatures The Dodge heater thermostat combo can be used in these low ambient conditions The Dodge heater thermostat combo turns on at 70 F and...

Страница 10: ...135290 135291 135292 135293 135294 135295 135296 135297 135298 135299 135135 36 38 RTL Seal Kit Clamp Seal Assembly O Ring 2 2 2 435001 435002 435003 435004 435005 435006 435007 435008 435009 435010...

Страница 11: ...ld cuttable stainless steel probe a platinum sensing element and a spring loaded fitting with an oil seal COOL LUBE 2 All the features of the OLF 2 system plus a built in heat exchanger for continuous...

Страница 12: ...Dodge Industrial Inc 1061 Holland Road Simpsonville SC 29681 1 864 297 4800 All Rights Reserved Printed in USA MN3060 02 22 3060 0222 DODGE INDUSTRIAL INC AN RBC BEARINGS COMPANY...

Отзывы: