29
Commissioning
DEU
ENG
The following cross-sections are applicable for the plug-in/clamping con-
nections:
• rigid wire: 0.75 – 1.5 mm²
• flexible wire: 0.75 – 1.5 mm²
• 8 mm insulation stripped off the wire
1. Disconnect from the mains network and secure against unintended
activation.
2. Connect phase (L) and neutral conductor (N) for supply (see „1“ page 2):
3. Lead the switched phase (1) to the conductor.
4. Insert the UP-Switch Actuator and Meter into a suitable flush-type box.
Remove the fixing lug if necessary.
5. Close the flush-type box with a suitable cover.
6. Connect to the mains network.
The teach-in mode is activated for three minutes. (see „Teach-in of the
device“ page 31)
5.1.2 Installation in surface box
WARNING
Electrical voltage! Danger to life!
¾
Only an authorised electrician may install and connect the device.
¾
Always disconnect from the mains network and secure against unin-
tended activation before assembly and installation.
Содержание DT5648
Страница 2: ...2 ENG DEU DEU 20 4 1x 1 DEU ENG 2 2 Key SGTIN QR 1x...
Страница 3: ...3 DEU ENG DEU 2 3 D B C A E...
Страница 5: ...5 DEU ENG 8 Reinigen 17 9 Werkseinstellungen herstellen 17 10 Au erbetriebnahme 18 11 Entsorgen 19...
Страница 21: ...21 DEU ENG 8 Cleaning 33 9 Resetting factory settings 33 10 Decommissioning 34 11 Disposal 35...
Страница 36: ...134458 1815...