30
Commissioning
ENG
DEU
The wiring of a room-by-room temperature control system depends on several
factors and must be planned and carried through carefully by the installer.
The following cross-sections are applicable for the plug-in/clamping con-
nections:
• rigid wire: 0.75 – 1.5 mm²
• flexible wire: 0.75 – 1.5 mm²
• 8 mm insulation stripped off the wire
1. Disconnect from the mains network and secure against unintended
activation.
2. Connect phase (L) and neutral conductor (N) for supply (see „1“ page 2):
3. Lead the switched phase (1) to the conductor.
4. Insert the UP-Switch Actuator and meter into a suitable surface box
(e. g. Abox 025 or Abox 040 (see „3“ page 3).
5. Fix the fixing lug of the UP-Switch Actuator and meter to the support
protrusion and screw it down if necessary.
6. Close the surface box with the corresponding cover.
7. Switch on the mains voltage.
9
The teach-in mode is activated for three minutes (see „Teach-in of the
device“ page 31).
Содержание DT5648
Страница 2: ...2 ENG DEU DEU 20 4 1x 1 DEU ENG 2 2 Key SGTIN QR 1x...
Страница 3: ...3 DEU ENG DEU 2 3 D B C A E...
Страница 5: ...5 DEU ENG 8 Reinigen 17 9 Werkseinstellungen herstellen 17 10 Au erbetriebnahme 18 11 Entsorgen 19...
Страница 21: ...21 DEU ENG 8 Cleaning 33 9 Resetting factory settings 33 10 Decommissioning 34 11 Disposal 35...
Страница 36: ...134458 1815...