SK500 Operator’s Manual
Prepare - 25
Classify Jobsite
CMW
Apply Precautions
Once classified, precautions appropriate for jobsite must be taken.
Electric Jobsite Precautions
Use one or both of these methods.
•
Expose line by careful hand digging or soft excavation.
•
Have service shut down while work is in progress. Have electric company test lines before returning
them to service.
Natural Gas Jobsite Precautions
In addition to positioning equipment upwind from gas lines, use one or both of these methods.
•
Expose lines by careful hand digging or soft excavation.
•
Have gas shut off while work is in progress. Have gas company test lines before returning them to
service.
Crystalline Silica (Quartz) Dust Precautions
Follow OSHA or other guidelines for exposure to crystalline silica when trenching, sawing or drilling
through material that might produce dust containing crystalline silica (quartz).
Other Jobsite Precautions
You may need to use different methods to safely avoid other underground hazards. Talk with those
knowledgeable about hazards present at each site to determine which precautions should be taken or if
job should be attempted.
Содержание SK500
Страница 1: ...SK500 Operator s Manual 054 091 Issue 2 0 CMW...
Страница 9: ...Contents 8 SK500 Operator s Manual CMW...
Страница 30: ...SK500 Operator s Manual Drive 29 CMW Drive Chapter Contents Start Unit 30 Drive 30 Shut Down 31...
Страница 33: ...Drive 32 SK500 Operator s Manual Shut Down CMW...
Страница 46: ...SK500 Operator s Manual Service 45 Overview CMW Overview t05om006c eps 500 h 250 h 100 h 50 h 20h 10h...
Страница 65: ...Service 64 SK500 Operator s Manual 500 Hour CMW...
Страница 72: ......
Страница 73: ......
Страница 74: ...SK500 Operator s Manual Service Record 73 CMW Service Record Service Performed Date Hours...
Страница 75: ...Service Record 74 SK500 Operator s Manual CMW Service Performed Date Hours...