
HT25 - SPECIFICATIONS
93
HT25
HT25 - SPECIFICATIONS
93
HT25
SPECIFICATIONS
HT25
*Dimensions are based on unit equipped with 3 ft (.91 m) centerline digging
attachment and backfill blade.
DIMENSIONS*:
U.S.
METRIC
A
Max. trench depth
39 in
99 cm
A2
Angle of approach
19°
19°
A3
Angle of departure
18°
18°
B
Max. trench width
16 in
40.6 cm
C
Boom angle down
53°
53°
C1
Boom angle up
50°
50°
H1
Height, top of cab
80 in
203 cm
L2
Basic unit length-transport
120 in
304.8 cm
L4
Centerline of track, hub-to-hub
39 in
99 cm
W2
Width, transport
35.5 in
90.2 cm
SPECIFICATIONS
HT25
*Dimensions are based on unit equipped with 3 ft (.91 m) centerline digging
attachment and backfill blade.
DIMENSIONS*:
U.S.
METRIC
A
Max. trench depth
39 in
99 cm
A2
Angle of approach
19°
19°
A3
Angle of departure
18°
18°
B
Max. trench width
16 in
40.6 cm
C
Boom angle down
53°
53°
C1
Boom angle up
50°
50°
H1
Height, top of cab
80 in
203 cm
L2
Basic unit length-transport
120 in
304.8 cm
L4
Centerline of track, hub-to-hub
39 in
99 cm
W2
Width, transport
35.5 in
90.2 cm
Содержание ht25
Страница 8: ...8 HT25 CONTENTS ...
Страница 10: ...10 HT25 OVERVIEW ...
Страница 34: ...34 HT25 SAFETY SAFETY ALERTS ...
Страница 45: ...HT25 TRENCHING 45 CONTROL OVERVIEW TRENCHING CONTROL OVERVIEW 1 Boom lift control 2 Digging chain control ...
Страница 52: ...52 HT25 TRENCHING ...
Страница 58: ...58 HT25 BACKHOE ...
Страница 71: ...HT25 LUBRICATION 71 BACKFILL BLADE BACKFILL BLADE Pivot Wipe zerk clean and lube every 10 hours with EPG ...
Страница 72: ...72 HT25 LUBRICATION ...
Страница 92: ...92 HT25 MAINTENANCE ...
Страница 101: ......
Страница 102: ......
Страница 103: ...HT25 103 ...