
82
HT25 - MAINTENANCE
GROUND DRIVE
82
HT25 - MAINTENANCE
GROUND DRIVE
Track Sprocket Bolts
Check sprocket bolts after first 50 hours and every 100 hours
thereafter. Torque bolts to 70 ft•lb (95 N•m).
Front Idler Roller
Check front idler roller for wear every 100 hours. Replace if
needed.
Track Sprocket Bolts
Check sprocket bolts after first 50 hours and every 100 hours
thereafter. Torque bolts to 70 ft•lb (95 N•m).
Front Idler Roller
Check front idler roller for wear every 100 hours. Replace if
needed.
Содержание ht25
Страница 8: ...8 HT25 CONTENTS ...
Страница 10: ...10 HT25 OVERVIEW ...
Страница 34: ...34 HT25 SAFETY SAFETY ALERTS ...
Страница 45: ...HT25 TRENCHING 45 CONTROL OVERVIEW TRENCHING CONTROL OVERVIEW 1 Boom lift control 2 Digging chain control ...
Страница 52: ...52 HT25 TRENCHING ...
Страница 58: ...58 HT25 BACKHOE ...
Страница 71: ...HT25 LUBRICATION 71 BACKFILL BLADE BACKFILL BLADE Pivot Wipe zerk clean and lube every 10 hours with EPG ...
Страница 72: ...72 HT25 LUBRICATION ...
Страница 92: ...92 HT25 MAINTENANCE ...
Страница 101: ......
Страница 102: ......
Страница 103: ...HT25 103 ...