
HT25 - BACKHOE
57
OPERATION
HT25 - BACKHOE
57
OPERATION
OPERATION
1.
Use boom/swing control and bucket/dipper control to dig hole
or trench.
•
Keep dipper and
boom at right
angles as much
as possible for
maximum power.
•
Keep bucket in
line with dipper as
much as
possible.
•
Position bucket
so teeth cut soil.
As soil is cut, curl
bucket under
dipper.
•
Move dipper and
bucket together.
Increasing
engine speed will
not increase
backhoe force.
2.
When hole or trench is complete, lift boom while keeping
dipper pointed at ground.
3.
Curl bucket closed and move dipper fully toward boom.
4.
Lift boom to highest position and latch stow lock.
om1761x
om1762
OPERATION
1.
Use boom/swing control and bucket/dipper control to dig hole
or trench.
•
Keep dipper and
boom at right
angles as much
as possible for
maximum power.
•
Keep bucket in
line with dipper as
much as
possible.
•
Position bucket
so teeth cut soil.
As soil is cut, curl
bucket under
dipper.
•
Move dipper and
bucket together.
Increasing
engine speed will
not increase
backhoe force.
2.
When hole or trench is complete, lift boom while keeping
dipper pointed at ground.
3.
Curl bucket closed and move dipper fully toward boom.
4.
Lift boom to highest position and latch stow lock.
om1761x
om1762
Содержание ht25
Страница 8: ...8 HT25 CONTENTS ...
Страница 10: ...10 HT25 OVERVIEW ...
Страница 34: ...34 HT25 SAFETY SAFETY ALERTS ...
Страница 45: ...HT25 TRENCHING 45 CONTROL OVERVIEW TRENCHING CONTROL OVERVIEW 1 Boom lift control 2 Digging chain control ...
Страница 52: ...52 HT25 TRENCHING ...
Страница 58: ...58 HT25 BACKHOE ...
Страница 71: ...HT25 LUBRICATION 71 BACKFILL BLADE BACKFILL BLADE Pivot Wipe zerk clean and lube every 10 hours with EPG ...
Страница 72: ...72 HT25 LUBRICATION ...
Страница 92: ...92 HT25 MAINTENANCE ...
Страница 101: ......
Страница 102: ......
Страница 103: ...HT25 103 ...