6 Performing Other Network Tests
AIM User’s Manual
52
5
Use
c
or
d
to highlight the location where you are testing.
6
Connect the AIM in series with the equipment at the location where you want to
test.
7
Press
SELECT
and wait briefly for the results of the test.
8
On the
IN-LINE TEST RESULTS
screen, review the results of the test. The screen
indicates whether the test passed or failed. The screen also shows:
–
Voltage
supplied (in volts).
–
Current
supplied (in milliamps).
– If present, amplitude of the 22 kHz
tone
.
– Indication as to whether
DiSEqC
commands are being received by the
multiswitch (
MSW
) and
BBC
.
9
Troubleshoot any problems following the instructions provided by DIRECTV.
10
Press
DONE
to return to the
TEST
screen.
Example:
To test between the ODU and the
multiswitch, disconnect the cable connecting
the ODU to the multiswitch and connect it
to the AIM’s ODU F connector. Then connect
the AIM’s IRD F connector to the multiswitch.
Note:
As messages are received from the
multiswitch (MSW) and BBC, the multiswitch
port and BBC frequency range flash bold. If no
messages are received, “N/A” appears.