Page 86
AIM 2 Operation Manual
6.
Connect the Cable Test Load to one end of the
cable you want to test. Then connect the other
end of the cable to the AIM ODU F connector.
7. Press
NEXT
and wait briefly for the results of
the test.
8. On the
CABLE RESISTANCE RESULTS
screen, review the resistance of the cable in
ohms, adjusted for the 25 Ω Cable Test Load.
9. Troubleshoot any problems following the
instructions provided by DIRECTV.
To repeat the Cable Resistance test, press
REPEAT
.
10. Press
DONE
to return to the
TEST
screen.
If a message appears stating that DC voltage was detected,
the cable is not connected to the Cable Test Load.
Make sure you are testing the appropriate cable, then press
NEXT to continue the test.
Содержание Advanced Installation Meter 2
Страница 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 108: ...Made in U S A ...