Page 82
AIM 2 Operation Manual
6.
Connect the AIM ODU F connector at the
location in the distribution network where you
want to test.
7. Press
NEXT
to go to the
TRANSPONDER
SURVEY
screen.
8. If the installation includes two ODUs, highlight
the ODU to test and press
SELECT
to
continue.
9. If you want to select an individual polarity for
the transponder survey, do the following:
• Press
OPTIONS
.
• On the
TR SURVEY OPTIONS
screen,
highlight the polarity for the survey.
• To continue, press
SELECT
to go to the
TRANSPONDER SURVEY
screen.
Содержание Advanced Installation Meter 2
Страница 6: ...Page 6 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 12: ...Page 12 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 14: ...Page 14 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 44: ...Page 44 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 50: ...Page 50 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 60: ...Page 60 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 66: ...Page 66 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 92: ...Page 92 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 104: ...Page 104 AIM 2 Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK ...
Страница 108: ...Made in U S A ...