August 2003
Rev. 2
Page 2
©
2003 Dionex
This Quick Installation Guide provides information about how to install the TCC-100
Thermostatted Column Compartment and its options. For additional information, please refer
to the
Operating Instructions
for the instrument.
1. General Information
1.1 Preparation
Bring the unit to a moderate temperature for four hours to allow any condensation that might
have occurred during transit to evaporate. Do not connect the unit to the mains during this
period. If it is obvious that condensation did not evaporate completely, continue to warm-up
the unit (which is not connected to the mains) until the condensation is completely gone.
Place the instrument on a firm and level surface that is free of vibration. Make sure that the
surface is resistant to solvents. Avoid locations with extreme changes in temperature (such as
direct sunlight or drafts) and high air humidity.
1.2 Electrical Connection
Connect the TCC-100 to the mains, using the
power cord shipped with the instrument.
Turn on the TCC-100 by pressing the power
switch on the rear panel.