![Dinstar SBC1000 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/dinstar/sbc1000/sbc1000_user-manual_2505876013.webp)
2 Installation
SBC1000 Session Border Controller
Copyright©2011-2018 Dinstar
7
2
Installation
2.1
Preparations before Installation
Attentions for Installation
Before you install the SBC1000 device, please read the following safety guidelines:
To guarantee SBC1000 works normally and to lengthen the service life of the device, the humidity of the
equipment room where SBC1000 is installed should be maintained at 10%-90% (non-condensing), and temperature
should be 0
℃
~ 45
℃
;
Ensure the equipment room is well-ventilated and clean;
Power supply of SBC1000 should be 100 ~ 240V AC, and its socket is a three-pin socket which should be
grounded well;
It’s suggested that personnel who has experience or who has received related training be responsible for
installing and maintaining SBC1000;
Please wear ESD wrist strap when installing SBC1000;
Please do not hot plug cables;
It’s advised to adopt uninterruptible power supply (UPS).
Preparations about Installation Site
Equipment Cabinet
Ensure the cabinet is well-ventilated and strong enough to bear the weight of SBC1000.
Trunk
Ensure telecom operator has approved to open a trunk.
IP Network
Ensure router under IP network has been prepared, since SBC1000 is connected to the IP network through the
standard 10/100/1000M Ethernet port.
Power Supply
Ensure the socket of SBC1000 is a three-pin socket and power supply is grounded well.