9
Wall Control Installation
Hard Wired Power Supplied
Installation
Before starting this installation,
it is helpful to initialize the Wall
Switch Remote Control with your
firebox (see Initialization section).
You should have the following
items ready and prepared:
•
Installed standard wall device
box with a minimum depth of
2.5 inch (6.35 cm).
•
A 24V~ power source leading
to the device box. Possible
sources could be a 24V~ door-
bell circuit or a Class 2 24V~
transformer.
•
The 24V~ wire leads coming
into the device box should have
between 4 and 6 inches (10-15
cm) of slack left inside the box
to allow for ease of installation
and/or servicing.
•
You may also leave the sup-
plied AAA batteries in the
Controller. There is an internal
electronic bypass that will draw
on the hard wired power source
before the batteries.
1. Unpack the Wall Switch Re-
mote Control and all hardware
from its package.
2. Release the Controller from
Figure 8
Outer
Housing
Controller
Guides
Tracks
Figure 9
Controller
Flat head screws
(supplied)
Wall Box
Outer Housing