background image

 

 
 

Pre-Installation 

 

C

la

ss 

H

In

st

al

la

ti

o

n

 a

n

d

 Us

er

 I

n

st

ru

ct

io

n

R

0

2

5

8

3

-1

3

 0

5

/1

7

 

Pa

g

9

 

CLEANING INSTRUCTIONS: Clean outer 
cladding  of  cylinder  with  a  soft  cloth 
dampened  with  warm  water  only.  Do 
not use abrasive or aggressive cleaning 
materials, such as alcohol or petroleum 
based solvents, as this may damage the 
surface of the product. 

 

4.3

 

Cold Water Supply 

 
For  satisfactory  and  safe  performance  of  the 
unvented  cylinder  the  water  supply  must  meet 
the following criteria: 
 

Minimum dynamic 
pressure 

150 kPa    
(1.5 bar) 

Maximum inlet  supply 
pressure 

1200 kPa    
(12 bar) 

Minimum flow rate 

15 l/min 

Max. chlorine content 

250mg/L 

Max. water hardness 

200mg/L 

 
The  following  instructions  have  to  be  followed 
when  installing  the  cold  water  mains  supply  to 
the cylinder: 
 

 

The cold water supply to the cylinder must 
come  directly  from  the  cold  water  mains 
after the mains stop valve to the property. 

 

 

The cold water inlet pipe work should have 
at  least  an  inside  diameter  of  19mm  and 
should meet the requirements of the water 
regulations  for  the  supply  of  wholesome 
water. 

 
Dimplex  recommend  an  annual  maintenance 
inspection  is  carried  out  on  the  domestic  hot 
water cylinder. In hard water areas this should 
include  inspection  of  the  heat  exchanger  and 
immersion heater, [above 120ppm or 120mg/l]. 
A local water treatment company should be able 
to  offer  free  water  quality  testing.  The  heating 
elements  may  require  periodic  de-scaling.  The 
installer should do this as part of a maintenance 
agreement. 
 
If required, precautions can be taken to minimise 
effects  of  water  hardness,  i.e.  installation  of 
water  conditioner  or  water  softener.  These 
devices should be installed in hard water areas 
where  high  water  storage  temperatures  are 
required,  i.e.  greater  than  60°C  storage 
temperatures, particularly when water hardness 
exceeds  200ppm.  Should  the  water  cylinder 
require de-scaling, this must be performed by a 
qualified technician. 

4.4

 

Building  Regulation  G3  Discharge 

Requirements 

 
As  part  of  the  requirements  of  Building 
Regulation G3 any discharge from an unvented 
system should be conveyed to where it is visible, 
but will not cause danger to persons in or about 
the building. The tundish and the discharge pipes 
should  be  fitted  in  accordance  with  the 
requirements  of  Building  Regulation  approved 
document  G3,  (England  and  Wales),  Part  P  of 
Northern Ireland and Standard 4.9 of Scotland. 
 
4.4.1

 

Discharge Pipe D2 

 
The  discharge  pipe  (D2)  from  the  Tundish 
should: 
 

 

“have  a  vertical  section  of  pipe  at  least 

300mm  long  below  the  tundish  before  any 
elbows  or  bends  in  the  pipework  and  be 
installed with a continuous fall of at least 1 
in 200 thereafter.” 

 
The discharge pipe (D2) should be made of: 
 

 

“metal;  or  other  material  that  has  been 

demonstrated  to  be  capable  of  safely 
withstanding  temperatures  of  the  water 
discharged  and  is  clearly  and  permanently 
marked  to  identify  the  product  and 
performance standard.”
 

 
Dimplex strongly recommends the use of metal 
pipework  only  and  Dimplex  does  not  take 
responsibility  for  any  damage  caused  from 
discharges. 
 
The discharge pipe d2 should be at least one pipe 
size  larger  than  the  nominal  outlet  size  of  the 
safety device unless its total equivalent hydraulic 
resistance  exceeds  that  of  a  straight  pipe  9m 
long,  i.e.  For  discharge  pipes  between  9m  and 
18m the equivalent resistance length should be 
at least two sizes larger than the nominal outlet 
size of the safety device; between 18 and 27m 
at least 3 sizes larger, and so on; bends must be 
taken  into  account  in  calculating  the  flow 
resistance. See Figure 2: Typical Discharge Pipe 
ArrangementFigure  2,  Table  2  and  the  worked 
example. 
 
Note:  An  alternative  approach  for  sizing 
discharge pipes would be to follow Annex D, 
section D.2 of BS 6700:2006 + A1:2009). 

Содержание ECS150HP40A-580

Страница 1: ...Important This Manual Must Be Left With The User After Installation EC Eau Cylinder Range Installation and User Instructions A Class Heat Pump Cylinders Up to 250L...

Страница 2: ...and commissioning of domestic heating and hot water systems in the UK and to encourage regular servicing to optimise safety efficiency and performance Benchmark places responsibilities on both manufa...

Страница 3: ...Overall View A Class HP Installation and User Instructions R02583 13 05 17 Page 3 0 Overall View Figure 1 Overall View of A Class Heat Pump Cylinder Installation Process 08 02 03 01 05 04 06 07 09...

Страница 4: ...2 Install the Inlet Group 12 5 1 3 Expansion Vessel 12 5 1 4 Balanced Cold Water Supply 12 5 1 5 Drain Valve 12 5 2 Hot Water Outlet 13 5 2 1 Thermostatic Mixing Valve 13 5 2 2 Pipe Insulation 13 5 3...

Страница 5: ...9 Technical Data and Product Fiche 27 9 1 A Class Heat Pump Buffer Range 27 9 2 Cylinder Heat Exchanger Pressure Drop 30 9 3 Cylinder Attainable Temperature 31 10 User Instructions 31 10 1 General 31...

Страница 6: ...in accordance with the wiring rules Before removing the cover from the immersion heater isolate appliance using isolating switch Danger of electrical shock Only use suitable electrically insulated equ...

Страница 7: ...se of delivering heated domestic and sanitary hot water as part of a pressurised water heating system The package is provided with fittings that comply with Section G3 of Building Regulations WARNING...

Страница 8: ...rent regulations The correct design and function has been verified by independent third party testing The correct application thereof is the responsibility of the competent installer water borne organ...

Страница 9: ...ures particularly when water hardness exceeds 200ppm Should the water cylinder require de scaling this must be performed by a qualified technician 4 4 Building Regulation G3 Discharge Requirements As...

Страница 10: ...tallation HP Installation and User Instructions R00918 6 01 13 Page 10 Figure 2 Typical Discharge Pipe Arrangement Table 2 Sizing of Copper Discharge Pipe D2 for Common Temperature Relief Valve Outlet...

Страница 11: ...onnected to it if plastic pipes are used as branch pipes carrying discharge from a safety device they should be either polybutalene PB or cross linked polyethylene PE X complying with national standar...

Страница 12: ...ter inlet group Furthermore it is recommended to mount the vessel higher than the cylinder to avoid having to drain the cylinder when maintaining and replacing the expansion vessel Figure 3 Connection...

Страница 13: ...charge from all the D1 discharge pipes connected to it The discharge pipe work from the expansion relief valve must be installed constantly falling to an open point of discharge It is recommended to c...

Страница 14: ...th your supplier When using compression fittings ensure that the connection is not over tightened 5 7 Coil Flow Connections If the flow connection is the highest point in the heat pump loop and if the...

Страница 15: ...Installation A Class HP Installation and User Instructions R02583 13 05 17 Page 15 Figure 6 Wiring Configuration of Space Heating and Hot Water Dimplex A Class Cylinder...

Страница 16: ...do this remove the hood A by removing the fixing screws at the bottom sides Step 2 Remove the insulation foam B to access the sensor mounting plate C and remove the M5 fixing screws in the four corne...

Страница 17: ...additional sensors D Repeat for both positions Step 4 Move the sensor mounting plate back into its fixing position Be careful not to kink the capillaries that connect the thermostat bulbs Fit the fou...

Страница 18: ...ion A Class HP Installation and User Instructions R02583 13 05 17 Page 18 Step 4 Replace the insulating foam over the sensor mounting plate Step 5 Replace the relay assembly as required and then refit...

Страница 19: ...nder and heat pump must be installed See Figure 8Figure 9 Zoned connections must be wired via the cylinder PCB i e circulation pumps and or zone valves 5 9 3 See Figure 9 Temperature sensors and digit...

Страница 20: ...nection The Modbus cables can be fed inside the low voltage trunking LHR under the metal hood and clamped to the strain relief bar using the supplied cable ties Note The earth shield in the cable from...

Страница 21: ...ce to display the actual cylinder temperature NTC zone sensors allow the user interface to display room temperature in up to 4 different zones and actuate the corresponding controls accordingly Digita...

Страница 22: ...Installation A Class HP Installation and User Instructions R02583 13 05 17 Page 22 Figure 10 Digital Inputs Temperature Sensors...

Страница 23: ...Figure 11 The secondary return pipe should incorporate a check valve and a WRAS approved circulation pump timer and thermostat to be provided separately Where secondary return circuits are used then a...

Страница 24: ...Turn on the supply to the cylinder and fill until water runs from the open hot water tap Continue to flush the system until all debris has been removed 6 Close the hot water tap 7 Check all joints fo...

Страница 25: ...drain valve and ensure a safe discharge 7 Note the set pressure of the pressure reducing valve Remove cartridge and clean strainer in water provided in container Re assemble pressure reducing valve en...

Страница 26: ...Class HP Installation and User Instructions R02583 13 05 17 Page 26 8 Spare Parts Figure 12 Replacement Part Numbers for Heat Pump Range of Cylinders ECS150HP40A 580 only ECS210HP40A 580 only ECS250H...

Страница 27: ...A Class HP Installation and User Instructions R02583 13 05 17 Page 27 9 Technical Data and Product Fiche 9 1 A Class Heat Pump Buffer Range Figure 13 A Class Heat Pump Cylinder and Cross Section For...

Страница 28: ...580 580 HW Outlet mm 1150 1525 1800 T P Valve mm 1150 1525 1800 Secondary Return mm CW Inlet mm 440 440 440 HP Buffer Flow HP Flow to Buffer mm 180 180 180 HP Buffer Flow Buffer Flow to HP mm 312 312...

Страница 29: ...ss steel Coil specification heat pump coil surface area m 2 2 HX performance heat pump coil kW 46 43 42 max working pres Bar 3 Immersion heater 1 F BSP 3kW 240 V Thermostatic control direct input Rod...

Страница 30: ...tructions R02583 13 05 17 Page 30 9 2 Cylinder Heat Exchanger Pressure Drop Figure 14 Heat Exchanger Pressure Drop for 2 2m Coils 0 2000 4000 6000 8000 10000 12000 14000 0 0 0 5 1 0 1 5 2 0 2 5 Pressu...

Страница 31: ...appropriate Building Regulations Part G3 England and Wales Part P of Northern Ireland and Section 6 of Scotland All installations must be notified to Local Area Building Control either directly or th...

Страница 32: ...heater B 4Reset limit thermostat s and inform installer C Intermittent water discharge through tundish on warm up C 1Expansion vessel lost charge C 1Check expansion vessel see commissioning maintenan...

Страница 33: ...Wiring A Class HP Installation and User Instructions R02583 13 05 17 Page 33 Figure 16 A Class Cylinder Wiring Overall View...

Страница 34: ...Wiring A Class HP Installation and User Instructions R02583 13 05 17 Page 34 Figure 17 A Class Installer Wiring Overall View...

Страница 35: ...Notes A Class HP Installation and User Instructions R02583 13 05 17 Page 35...

Страница 36: ...Notes A Class HP Installation and User Instructions R02583 13 05 17 Page 36...

Страница 37: ......

Страница 38: ......

Страница 39: ...er Instructions R02583 13 05 17 Page 39 Dimplex a division of GDC Group Ltd Millbrook House Grange Drive Hedge End Southampton SO30 2DF Tel 0845 879 3588 Fax 0845 879 3583 e mail customer services gdc...

Отзывы: