13. At this point determine which side of the heater off peak and on peak 
supplies are to be connected. If off peak supply is to be connected from 
the right hand end and on peak from left hand end proceed to next step. 
If wiring of the building does not correspond with these cable entry points 
then it will be necessary to secure the cable to the base of the rear of the 
heater using the ties supplied in the " xing kit, ensure there is suf" cient 
cable free to make connection easier later on.

14. Secure the heater to wall " xing bracket by replacing the two screws 
and spacer bushes removed in step 11. The feet and wall mounting ar-
rangement are designed to accommodate skirting board sizes up to 25mm 
(1”) thick. 

To avoid obstructing the air" ow to the rear of the heater the 

following must be strictly adhered to:

(a) For skirtings higher than 100mm (4”) it will be necessary to position 
the heater with the screws attached through the alternative " xing slots to 
the front.
(b) For skirtings have a height in excess of 150mm (6”) it will be necessary 
to reduce the height of the skirting to 150mm (6”) over the entire length of 
the heater plus 25mm (1”) at either end.

15. Remove bottom front panel securing screws. These were loosened in 
step 3 and should be easily unscrewed by hand.

16. Pull bottom of front panel forward to disengage the location pegs from 
the side panels and clear it from bottom of heater.

17. Still holding bottom of front panel forward, lift upwards (1), to disengage 
top edge of front panel from groove on heater top panel and remove front 
panel from heater (2).

18. Remove the screw securing the convector controls bracket to the side 
panel along with the spacer, nut and washer, taking care to ensure that 
the retaining nut is not dropped

Содержание CXLS24

Страница 1: ...e heater Only heat resisting cable minimum rating T85 should be used If used in a bathroom the heater must be installed such that switches and other controls cannot be touched by a person in the bath...

Страница 2: ...each end packaging piece Stand heater on its feet and remove all packaging pieces 5 Position heater against wall in intended nal position taking note of the minimum xing dimensions given below If tted...

Страница 3: ...than the length of the plastic insert so that the xing is made below the plaster layer 12 Low Density Block Walls A specialised xing such as the Uni x LB70 should be employed following closely the ma...

Страница 4: ...the following must be strictly adhered to a For skirtings higher than 100mm 4 it will be necessary to position the heater with the screws attached through the alternative xing slots to the front b Fo...

Страница 5: ...l packing by sliding it up and off the elements taking care not to damage the insulation 23 Remove one element to allow access for the back row of bricks On the CXL24N CXLS24N remove the element to ri...

Страница 6: ...n 20 are replaced securely 29 Replace the spacer nut washer and screw removed in 18 and reconnect the two quick connect terminals removed in 19 30 Connect the off peak supply to the storage terminal b...

Страница 7: ...ircuit 900W 1450W 2000W Note if the heater is situated underneath a shelf or overhand up to 250mm high then the brown wire should remain in circuit 33 Holding the bottom edge if the front panel toward...

Страница 8: ...AIR SENSING STAT Peak Circuit Diagram CXL24N CXLS24N BROWN BROWN CUT OUT MAUVE BLUE BLUE BLUE BROWN MAUVE BROWN CONVECTOR ELEMENT CONVECTOR ELEMENT ELEMENT SELECTOR BLOCK MAINS BLOCK L SWITCH NEON AI...