13. At this point determine which side of the heater off peak and on peak
supplies are to be connected. If off peak supply is to be connected from
the right hand end and on peak from left hand end proceed to next step.
If wiring of the building does not correspond with these cable entry points
then it will be necessary to secure the cable to the base of the rear of the
heater using the ties supplied in the " xing kit, ensure there is suf" cient
cable free to make connection easier later on.
14. Secure the heater to wall " xing bracket by replacing the two screws
and spacer bushes removed in step 11. The feet and wall mounting ar-
rangement are designed to accommodate skirting board sizes up to 25mm
(1”) thick.
To avoid obstructing the air" ow to the rear of the heater the
following must be strictly adhered to:
(a) For skirtings higher than 100mm (4”) it will be necessary to position
the heater with the screws attached through the alternative " xing slots to
the front.
(b) For skirtings have a height in excess of 150mm (6”) it will be necessary
to reduce the height of the skirting to 150mm (6”) over the entire length of
the heater plus 25mm (1”) at either end.
15. Remove bottom front panel securing screws. These were loosened in
step 3 and should be easily unscrewed by hand.
16. Pull bottom of front panel forward to disengage the location pegs from
the side panels and clear it from bottom of heater.
17. Still holding bottom of front panel forward, lift upwards (1), to disengage
top edge of front panel from groove on heater top panel and remove front
panel from heater (2).
18. Remove the screw securing the convector controls bracket to the side
panel along with the spacer, nut and washer, taking care to ensure that
the retaining nut is not dropped