E
N
G
L
IS
H
9
INSTALLATION LAYOUT
1
Actuator
cable 4 x 1 mm
2
2
Blinker
cable 2 x 1,5 mm
2
3
Aerial
cable RG-58
4
Key or digital selector
cable 2 x 1 mm
2
5
Safety ribbon (EN 12978)
-
6
Internal photocells
cable 4 x 1 mm
2
(RX)
cable 2 x 1 mm
2
(TX)
7
External photocells
cable 4 x 1 mm
2
(RX)
cable 2 x 1 mm
2
(TX)
8
Control unit
cable 3 x 1,5 mm
2
PREPARATORY STEPS
The new series of actuadors MOOV, has been devised to serve gates up to 200 Kg with leaf up to 5 meters wide (look at the table
technical data). Before proceeding with the installation, please make sure that your gate opens and closes freely, and that:
• Hinges and pins are in optimum condition and properly greased.
• No obstacles are within the moving area.
• There is no friction with the ground or between the leaves.
• Your gate shall be equipped with central
A
and side
B
stops, which are fundamental for the good system operation.
Содержание MOOV-B300 120V
Страница 1: ......
Страница 2: ......
Страница 4: ......
Страница 35: ......
Страница 36: ......
Страница 38: ......
Страница 46: ...ITALIANO 8 TABELLA COLLEGAMENTI ELETTRICI...
Страница 58: ...ENGLISH 20 ELECTRICAL CONNECTION TABLE...
Страница 70: ...FRAN AIS 32 TABLEAU BRANCHEMENTS LECTRIQUES...
Страница 82: ...ESPA OL 44 CUADRO DE CONEXIONES EL CTRICAS...
Страница 94: ...PORTUGU S 56 TABELA CONEX ES EL CTRICAS...
Страница 106: ...DEUTSCH 68 TABELLE ELEKTRISCHE ANSCHL SSE...
Страница 118: ...NEDERLANDS 80 ELEKTRISCHE AANSLUITINGEN...
Страница 123: ......
Страница 124: ......
Страница 126: ...L1 P1...
Страница 148: ......
Страница 150: ...Fig 1 Fig 2 Fig 3...
Страница 151: ...Fig 4 SYNCHRO...
Страница 152: ...Fig 5 NO SYNCHRO...