OPERATOR’S MANUAL
GAC® 2500 AGRI
11001-1626B-201405
UNPACKING THE INSTRUMENT
/
7
UNPACKING THE INSTRUMENT
UNLOCK SHIPPING BRACKETS
The GAC
®
2500 instrument contains (2) shipping brackets that secure the
measurement cell during shipping. After unpacking the instrument, the
shipping brackets must be unlocked and placed in the operating location
before proceeding to setup and operation.
To unlock shipping bracket:
1. Remove Allen wrench from upper foam packaging insert.
Figure 4
Remove Allen Wrench
2. Carefully remove unit from packaging and place on a flat, sturdy
surface.
3. Remove grain drawer and set aside.
4. Place unit on its backside. Shipping brackets are located on the left
and right side wall.
Figure 5
Remove Grain Drawer and Locate Shipping Brackets
Shipping
bracket on
each side
Содержание GAC 2500-AGRI
Страница 4: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 IV...
Страница 20: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 16 NAVIGATION...
Страница 68: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 64 GRAIN CALIBRATIONS...
Страница 70: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 66 DIAGNOSTICS...
Страница 82: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 78 MAINTENANCE...
Страница 84: ...OPERATOR S MANUAL GAC 2500 AGRI 11001 1626B 201405 80 TROUBLESHOOTING...