
INSTALLATION
20
Turn off the instrument using the power switch on the rear panel. The
„OFF‟ position
is marked by
„
O
’
symbol.
2.3.3. Preparing for shipment
Use the second item in the Shutdown menu when the instrument is to be shipped or
left unused for a longer time (more than 1 week). The instrument will ask you to use
the cleaning tube kit and 100ml of distilled water.
Follow the instructions appearing on the display.
SHUTDOWN
Preparing for shipment (2)
Remove tubing connectors, so the system
can drain itself.
Leave the waste connector attached.
Next, you should connect the cleaning
tube kit to the reagent inputs, submerging
the free end in a bottle containing at least
100 ml of distilled water.
Cleaning tube kit connected
The analyzer will flush any remaining
reagents from the system into the waste
container.
As a next step, the analyzer asks you to
remove the cleaning tube kit. Leave Waste
connected.
When finished, the analyzer prompts you
to power off the system. Remove the
waste connector after shutting down.
2.3.4. Handling in Emergency
In case of emergency situation - like instrument catching on fire (short-circuit, etc.) -
cut off power immediately by disconnecting mains power or DC input line, and use a
fire-extinguisher if necessary.
Содержание Abacus junior 30
Страница 3: ......