
INSTALLATION
19
When SW is loaded, Main menu is displayed.
Tap a touch-screen item to go activate the
menu element.
CAUTION!
Wait 5 minutes before initiating any measuring process to allow
the instrument to reach the optimal working temperature.
In some cases, a priming cycle is necessary prior to sample introduction. The
instrument will perform priming cycle automatically if additional liquid in the tubing
system is required.
Run a priming cycle in case of:
installation
extended time out of use
replacement of any component related to the Fluidic System
replacement of reagents with instrument turned on
2.3.2. Turning the Instrument OFF
DO NEVER turn off the analyzer by simply flipping the power switch on the rear
panel. Doing so may result in erroneous operation during later use. It can be so,
because the instrument uses diluent. This liquid is an isotonic saline solution
containing salt. Would it not be washed out of special units of the instrument or would
chambers not be filled with this solution may lead to dust condensation or salt build
up.
Therefore always follow the instructions below when switching the instrument off.
In Main menu, select SHUTDOWN. The following screen appears.
EXIT
SHUTDOWN
Select
Shutdown
.
The analyzer will perform the necessary
steps to prevent failure to the pneumatic
system, and then gives a tone indicating
that it is safe to shut it off.
Turn off power using the rear power switch.
Содержание Abacus junior 30
Страница 3: ......