DGC ZM-DGC900 Скачать руководство пользователя страница 6

 

the space around CSP is very small.  
d. Lay on BGA Flux Paste 

Laying  solder paste on the PCB  has  important  influence on the result of BGA 

Rework. It is convenient to lay solder paste on the PCB by selecting mould matched with 
BGA. For CSP, there are three solder pastes for choice, including flux paste, clean-free and 
water-soluble. If we choose the flux paste, the reflow time should be longer, if choose the clean-
free solder paste, reflux temperature should be lower. 
(1) Mounting: The main purpose of mounting to make every BGA solder align to the PCB pad 

with special equipment. 

(2)Hot air reflow: Hot air reflow soldering is the key to the whole BGA Rework. 

The curve of reflow soldering of BGA Rework should be similar with the original soldering 

one. Hot air reflow soldering curve can be divided into four zones, including preheat zone, heating 
zone, recirculation zone and cooling area. These four zones’ temperature and time parameter can be 
set respectively, when it connects with the computer, these programs can be saved and transferred at 
any moment. 

In reflow soldering process, we must choose the right heating temperature and time of different 

zones; at the same time, we should notice the heating speed. Commonly, the maximal heating rate 
is not more than 6

/s before 100

, and the maximal heating rate is not more than 3

/s 

after 100

. In the cooling zone, the maximal cooling rate is not more than 6

/s, because 

both of the exorbitant heating rate and cooling rate may cause damage to PCB and BGA, 
which sometimes cannot be observed by unaided eyes. For different BGA and 
different  solder pastes, we should choose different heating temperature and time. For example, 
reflux temperature of CBGA BGA should be higher than that of PBGA…choose the 
higher reflux temperature. For no clean solder paste, its activity is lower than non-no clean solder 
paste, so the soldering temperature should not be too high, and the soldering time should not be too 
long, so as to prevent the oxidation of solder particle. 

In  hot air  reflow soldering, the bottom of PCB board should be heated. There are two 

purposes for this kind of heating. First, avoid the warping and deformation in one-side 
heated PCB board; second, shorten the time of the solder paste melting. For the dimension pad 
of BGA rework, this kind of heating on the bottom of PCB is especially important. There are 
two ways of heating on the bottom of BGA rework equipment. One of them is hot air heating, 
and the other is infrared ray heating. The advantage of hot air heating is the homogeneous heating, 
which common Rework Techniques suggest to adopt this way of heating.    What opposite with it is 
the disadvantage of infrared ray’s inhomogeneous heating. 

We should choose the right hot air reflux suction nozzle. The hot air reflux nozzle is non-

contact heating, which depend on the high temperature air current make every solder of joint on 
BGA melt synchronously. For that reason, it ensures the steady temperature circumstance in the 
whole of reflux process, and it protects the adjacent parts from damaging by the convective hot air’s 
regeneration.  

 

C. Installation 

 

1.

 

 Place 

In order to ensure the validity of BGA Rework Station, the installation should meet the following 
requirements.  
a.

 

Away from inflammable and explosives; 

b.

 

Away from water and other liquids; 

c.

 

Ventilated, dry place; 

d.

 

Stable and flat, free from tremor. 

e.

 

Less dust; 

f.

 

No heavy objects on the controlling box; 

g.

 

Not affected by airflow of air conditioner, heater or ventilator. 

 

6

Содержание ZM-DGC900

Страница 1: ...1 BGA Rework Station ZM DGC900 SOFTWARE SOLUTIONS Address Office 12D Fuxin Building 318 Fuhua Road 558000 Shenzhen China Telephone 86 0755 88360496 Fax 86 0755 83292149 Http www dragongroupchina com...

Страница 2: ...BGA Rework Station C Installation D Safety Cautions E Introduction of Structure F Operation Steps G PLC Programmable logic Controller H Curve Program Controller I Related information J Tips for opera...

Страница 3: ...ll Grid Array It is a kind of package method which use organic carrier in IC It has the following features Small package area Greater functions and more pins Self centerize while PCB puddle welding ea...

Страница 4: ...welding paste will flow from the welding pad to the rabbet then leads to short circuit between welding pad and rabbets nearby The geometric shape and diameter of welding pad The compactness of pins ha...

Страница 5: ...no more than 20 of the solder ball s diameter 2 Desoldering spots No desoldering spots 3 Bridging and short circuit When there is extra solder or the solder is not put on the right place bridging and...

Страница 6: ...and time For example reflux temperature of CBGA BGA should be higher than that of PBGA choose the higher reflux temperature For no clean solder paste its activity is lower than non no clean solder pa...

Страница 7: ...fire or an electric shock 7 There are high pressure parts in the circuit box Don t disassemble it 8 If some metals fall in the rework station when it is working turn off the power immediately After i...

Страница 8: ...positioning Max PCB size 280 320mm mm 8 Weight 20kg Features 1 Choose imported high precision materials temperature sensor PLC heater to control BGA desoldering soldering procedures precisely 2 Top bo...

Страница 9: ...d down and the damage caused by temperature difference is less To use some flux paste when cleaning the pad can increase the solder activity and achieve better cleaning effect Be careful to not to des...

Страница 10: ...of 1 2 3 4 5 0 and the temperature graphs choose NO X from ten groups take NO 1 group as an example D I S P S E L E S E T P R O G R U N P R O G P T N P A R S E T H A N D A U T O P V S V P C 4 1 0 P T...

Страница 11: ...R O G P T N P A R S E T H A N D A U T O P V S V P C 4 1 0 P T N S T E P P R O R U N O U T 1 O U T 2 S V A L 1 M A N M V T I M E C O M A L T E C 1 L 1 1 6 0 0 0 4 Preheating section time d set Press th...

Страница 12: ...L 1 M A N M V T I M E C O M A L T E C 1 L 2 1 8 5 7 Enter the second section constant temperature time set press UP DOWN to modify Press the PAR to define D I S P S E L E S E T P R O G R U N P R O G...

Страница 13: ...OWN to modify Press the PAR to define D I S P S E L E S E T P R O G R U N P R O G P T N P A R S E T H A N D A U T O P V S V P C 4 1 0 P T N S T E P P R O R U N O U T 1 O U T 2 S V A L 1 M A N M V T I...

Страница 14: ...1 M A N M V T I M E C O M A L T E C 1 d 4 3 5 14 Enter the fifth section heating up speed set press UP DOWN to modify Press the PAR to define D I S P S E L E S E T P R O G R U N P R O G P T N P A R S...

Страница 15: ...ND AUTO P V SV P C410 P TN ST EP PRO RUN O UT1 OUT2 SV AL1 MAN M V TIME C OM ALTEC 1 r8 End Remarks if you need to increase the temperature then press the UP to open 18 Set finished then it will show...

Страница 16: ...set to prog TIME shows the remaining time of certain period of procedures While the meter is set to constant temperature controller TIME shows cent code In some special type of instrument TIME shows t...

Страница 17: ...SELECT button the lower screen shows settings value the output value or the remained time of operation the corresponding indicator SV MV TIME are on AUTO HAND is the automatic manual switch button Whe...

Страница 18: ...measured value is not vibrating After 1 5 periods of vibration the PID self setting is completed Then the AT lamp is off The meter can calculate the best PID parameter and save it in the meter accordi...

Страница 19: ...state of auto control f Software configuration code and meaning of function parameters Set the configuration password as 808 the parameter code Loc when the meter shows PV press button PAR and for 3 s...

Страница 20: ...sistance signal Distant transmission pressure resistance signal with decimal 8 Rddr Local address 0 99 9 bRud Communication baud rate 600 1200 2400 4800 9600 19 2KB 10 Ctrl Regulation On of PLd rSP Pr...

Страница 21: ...should be no less than 20s Regulation parameter ProP ln dEr rEL C ProP ln dEr rEL C are the four regulation parameters directly affecting control precision RL02 on Second alarming output Action suctio...

Страница 22: ...proportion then mutiplied by cooling coefficient Control mode parameter Rc When Rc is set at rEu the control mode is reverse acting control It means that as the input signal of the meter increases the...

Страница 23: ...varies according to different objects PID is over AT go out P I D parameters which have been set before will be kept in the meter automatically If we need to examine P I D parameters after setting we...

Страница 24: ...d for 3s the meter can enter the menu of curve program menu the upper screen display the code of the first parameter and the bottom one display the value of parameter Then we can change the value by a...

Страница 25: ...s the basic setting 2 Modification of parameters when the curve procedure runs a When the meter runs we can t modify the curve program parameter LC r1 L1 d1 r2 L2 d2 But other parameters can be modifi...

Страница 26: ...26...

Страница 27: ...use IR because the ceramic heater can t cool down very quickly thus it is difficult to control the time of higher reflow temperature However the convection can control strictly and it is conductive to...

Страница 28: ...he standard choice in USA Components manufacturers consider the using of lead free balls as the standard b Setting of temperature difference The temperature difference on the surface of components is...

Страница 29: ...te are necessary because the melting point of soldering balls on CBGA is much higher than common paste such as Sn63 and pb27 4 Removal of residual soldering tin and mounting of BGA Besides the tempera...

Страница 30: ...time The upper main heater arises to 8 10mm from the surface of BGA and pauses for 30 40s Or after the working light is off move the main heater away and take PCB away from the positioning bracket 5 B...

Страница 31: ...meet the fast increasing demand of BGA circuit assembly the manufacture companies need to choose safer faster and more convenient assembly and rework technology Appendix packing list Order Name Speci...

Отзывы: