DGC ZM-DGC900 Скачать руководство пользователя страница 4

 

(6)The tension between solder points produces good self-centration effect in solder-
reflow, allowing 5% error of patch precision. 
(7)Compatible with original SMT mount technology and machines. The original 
screen printer machine, mounter and solder-reflow machine all can be used. The 
comparison between BGA and QFP is shown in Table 1. The main defect of BGA is 
the necessity of X-ray detection after welding. 
c. Welding of BGA 

The success of welding BGA is affected by the assembly of PCB. So 3 key 

factors must be considered in the layout of PCB. 

Features BGA  QFP 

Package size S/m

2

525 1600 

Pin space L/mm 

1.27 

0.50 

fault rate (×10

- 6 /   p c s

 

0.60 100 

(1)Thermal management 

Thermal management must be considered when we design the assembly of PCB. 

If many pieces of BGA gather on a small area of PCB, it will cause the imbalance of 
PCB in the reflow oven. If many big pieces of BGA gather on a certain area of PCB, 
longer heating period will damage some of the BGA. The areas with fewer 
components have reached the welding temperature, while those areas with BGA are 
still in low temperature. So the welding period is over before the flux paste 
withdraws from the welding spots, thus there may be poor soldering or no-melting 
of welding balls. 
(2)Rabbet 

The design of rabbet on PCB should stick to relevant standards strictly. Any 

rabbet near BGA welding pad must cover the solder mask very well. If not, the extra 
welding paste will flow from the welding pad to the rabbet, then leads to short 
circuit between welding pad and rabbets nearby. 
The geometric shape and diameter of welding pad: 

The compactness of pins has immediate impact on the geometric shape and 

diameter of welding pad. Similarly, BGA has different sizes, shapes and complexity. 
As the package size decreases, the geometric shape and diameter of the welding pad 
calls for higher precision in detection. 

 

 
 
3. Inspection standards of BGA  

For BGA assembled on PCB, inspection standard is a very important issue. 

Before BGA is applied to the PCB, most BGA manufacturers don't use X-ray in 
process of inspection. Instead, they employ some traditional methods to test PCB, 
such as automatic optical inspection, man-eye inspection or on-line function test. 
However, these methods can't detect the invisible problems very exactly, such as 
poor soldering, cold welding and bridging. The X-ray can discover these problems 
very efficiently. At the same time, it can do live monitoring, guarantee the quality, 
and realize the in-time feedback of the process control,   
a.

 

Evaluation of X-ray  

   When BGA is first used on BGA, X-ray can evaluate the solder-reflow according 
to the situation of un-solder area or areas around it. Open-circuit, non-touching and 
other similar situations show the solder paste has not reflow enough. Bridging may 
result from the fact that the temperature is too high for the solder to liquefy. So the 
solder flows from the pad to the interval between them, causing short-circuit. 

Poor welding should be evaluated objectively: it is not so terrible; the key 

 

4

Содержание ZM-DGC900

Страница 1: ...1 BGA Rework Station ZM DGC900 SOFTWARE SOLUTIONS Address Office 12D Fuxin Building 318 Fuhua Road 558000 Shenzhen China Telephone 86 0755 88360496 Fax 86 0755 83292149 Http www dragongroupchina com...

Страница 2: ...BGA Rework Station C Installation D Safety Cautions E Introduction of Structure F Operation Steps G PLC Programmable logic Controller H Curve Program Controller I Related information J Tips for opera...

Страница 3: ...ll Grid Array It is a kind of package method which use organic carrier in IC It has the following features Small package area Greater functions and more pins Self centerize while PCB puddle welding ea...

Страница 4: ...welding paste will flow from the welding pad to the rabbet then leads to short circuit between welding pad and rabbets nearby The geometric shape and diameter of welding pad The compactness of pins ha...

Страница 5: ...no more than 20 of the solder ball s diameter 2 Desoldering spots No desoldering spots 3 Bridging and short circuit When there is extra solder or the solder is not put on the right place bridging and...

Страница 6: ...and time For example reflux temperature of CBGA BGA should be higher than that of PBGA choose the higher reflux temperature For no clean solder paste its activity is lower than non no clean solder pa...

Страница 7: ...fire or an electric shock 7 There are high pressure parts in the circuit box Don t disassemble it 8 If some metals fall in the rework station when it is working turn off the power immediately After i...

Страница 8: ...positioning Max PCB size 280 320mm mm 8 Weight 20kg Features 1 Choose imported high precision materials temperature sensor PLC heater to control BGA desoldering soldering procedures precisely 2 Top bo...

Страница 9: ...d down and the damage caused by temperature difference is less To use some flux paste when cleaning the pad can increase the solder activity and achieve better cleaning effect Be careful to not to des...

Страница 10: ...of 1 2 3 4 5 0 and the temperature graphs choose NO X from ten groups take NO 1 group as an example D I S P S E L E S E T P R O G R U N P R O G P T N P A R S E T H A N D A U T O P V S V P C 4 1 0 P T...

Страница 11: ...R O G P T N P A R S E T H A N D A U T O P V S V P C 4 1 0 P T N S T E P P R O R U N O U T 1 O U T 2 S V A L 1 M A N M V T I M E C O M A L T E C 1 L 1 1 6 0 0 0 4 Preheating section time d set Press th...

Страница 12: ...L 1 M A N M V T I M E C O M A L T E C 1 L 2 1 8 5 7 Enter the second section constant temperature time set press UP DOWN to modify Press the PAR to define D I S P S E L E S E T P R O G R U N P R O G...

Страница 13: ...OWN to modify Press the PAR to define D I S P S E L E S E T P R O G R U N P R O G P T N P A R S E T H A N D A U T O P V S V P C 4 1 0 P T N S T E P P R O R U N O U T 1 O U T 2 S V A L 1 M A N M V T I...

Страница 14: ...1 M A N M V T I M E C O M A L T E C 1 d 4 3 5 14 Enter the fifth section heating up speed set press UP DOWN to modify Press the PAR to define D I S P S E L E S E T P R O G R U N P R O G P T N P A R S...

Страница 15: ...ND AUTO P V SV P C410 P TN ST EP PRO RUN O UT1 OUT2 SV AL1 MAN M V TIME C OM ALTEC 1 r8 End Remarks if you need to increase the temperature then press the UP to open 18 Set finished then it will show...

Страница 16: ...set to prog TIME shows the remaining time of certain period of procedures While the meter is set to constant temperature controller TIME shows cent code In some special type of instrument TIME shows t...

Страница 17: ...SELECT button the lower screen shows settings value the output value or the remained time of operation the corresponding indicator SV MV TIME are on AUTO HAND is the automatic manual switch button Whe...

Страница 18: ...measured value is not vibrating After 1 5 periods of vibration the PID self setting is completed Then the AT lamp is off The meter can calculate the best PID parameter and save it in the meter accordi...

Страница 19: ...state of auto control f Software configuration code and meaning of function parameters Set the configuration password as 808 the parameter code Loc when the meter shows PV press button PAR and for 3 s...

Страница 20: ...sistance signal Distant transmission pressure resistance signal with decimal 8 Rddr Local address 0 99 9 bRud Communication baud rate 600 1200 2400 4800 9600 19 2KB 10 Ctrl Regulation On of PLd rSP Pr...

Страница 21: ...should be no less than 20s Regulation parameter ProP ln dEr rEL C ProP ln dEr rEL C are the four regulation parameters directly affecting control precision RL02 on Second alarming output Action suctio...

Страница 22: ...proportion then mutiplied by cooling coefficient Control mode parameter Rc When Rc is set at rEu the control mode is reverse acting control It means that as the input signal of the meter increases the...

Страница 23: ...varies according to different objects PID is over AT go out P I D parameters which have been set before will be kept in the meter automatically If we need to examine P I D parameters after setting we...

Страница 24: ...d for 3s the meter can enter the menu of curve program menu the upper screen display the code of the first parameter and the bottom one display the value of parameter Then we can change the value by a...

Страница 25: ...s the basic setting 2 Modification of parameters when the curve procedure runs a When the meter runs we can t modify the curve program parameter LC r1 L1 d1 r2 L2 d2 But other parameters can be modifi...

Страница 26: ...26...

Страница 27: ...use IR because the ceramic heater can t cool down very quickly thus it is difficult to control the time of higher reflow temperature However the convection can control strictly and it is conductive to...

Страница 28: ...he standard choice in USA Components manufacturers consider the using of lead free balls as the standard b Setting of temperature difference The temperature difference on the surface of components is...

Страница 29: ...te are necessary because the melting point of soldering balls on CBGA is much higher than common paste such as Sn63 and pb27 4 Removal of residual soldering tin and mounting of BGA Besides the tempera...

Страница 30: ...time The upper main heater arises to 8 10mm from the surface of BGA and pauses for 30 40s Or after the working light is off move the main heater away and take PCB away from the positioning bracket 5 B...

Страница 31: ...meet the fast increasing demand of BGA circuit assembly the manufacture companies need to choose safer faster and more convenient assembly and rework technology Appendix packing list Order Name Speci...

Отзывы: