Energy Star Compliant System Board
2-4
u
Installation Overview
Locations of the HSIMM Sockets on the G486-EVB System Board
EC802G
EC100G
Bank 3
Bank 2
Bank 1
Bank 0
Pin 1 of the HSIMM socket
Installing the Modules
HSIMMs simply snap into a socket on the system board.
Pin 1 of the HSIMM must correspond with Pin 1 of the
socket.