background image

SECTION 2 

OPERATION 

 

 

2.1) 

ADJUSTMENTS AND START-UP 

 
 

CAUTION 

The  boiler  must  be  filled  with  water  and  all  air 
purged  from  the  system,  before  turning  on  the 
power.  

 
 

CAUTION 

If the power is turned on before the boiler is filled 
with  water,  the  elements  will  become  seriously 
damaged. 

 

1. 

Adjust the setpoint of the boiler on the aquastat.  

2. 

Turn  on  the  power,  set  the  thermostat  at  30C  (85F).  The 
circulator;  The  circulator  should  start  as  well  as  the  electrical 
elements in sequence with a 8 seconds delay; 

3. 

The  circulator  stays  on  for  as  long  as  there  is  a  call  for  heat 
except if continuous flow switch, ob the side of the unit, is ON. 

 

2.2) 

MECHANICAL HIGH LIMIT 

 

Mechanical High Limit Control 

The  mechanical  limit  control  must  be  set  20

o

F  above  the  setpoint 

temperature on control aquastat.  
 

 

SECTION 3 

MAINTENANCE 

 

 

The property owner has the following responsibilities:  

a. 

Maintain the area around the boiler clean at all times and free 
from combustible and highly flammable material; 

b. 

Ensure  that  the  ambient  air  at  the  boiler  is  not  excessively 
dusty or humid; 

c. 

Have all water leaks repaired in the system as they arise. 

d. 

Ensure that the ambient temperature in the area where the unit 
is installed does not exceed 27

o

C (80

o

F). 

 
 

CAUTION 

The  boiler  guaranty  may  be  invalidated  if:  water 
leaks in the system are not repaired; the boiler is 
used  as  a  source  of  domestic  hot  water  or  a 
significant  amount  of  new  water  or  air  is 
introduced into the system.  

 

It  is  recommended  that  the  boiler  be  purged  annually,  in  order  to 
eliminate  sediment  and  sludge  that  may  have  accumulated  at  the 
bottom of the boiler and covering the heating elements.  

 

Procedure:  

1. 

Let the boiler cool down;  

2. 

Close the maintenance valves, which are installed at the water 
inlet  and  outlet  of  the  boiler.  N.B.:  It  is  not  recommended  to 
drain the water from the heating pipe system; 

3. 

Hook-up a garden hose to the drain valve and place it close to 
a floor drain; 

4. 

Open  the  purge  valve  until  the  water  comes  out  clean  and 
clear; 

5. 

Close the valve. 

 

It  is  recommended  to  perform  a  visual  inspection  of  the  boiler 
electrical  compartment  annually,  during  the  heating  season.  The 
items  to  check  are  the  water  tightness  of  the  elements,  signs  of 
overheating  of  the  electrical  components  and  the  wiring.  Corrective 
measures must be undertaken as required, as soon as possible. 
 
Defective  components  should  always  be  replaced  with  the  Original 
Equipment Manufacturer’s parts.  

 

 

SECTION 4 

INFORMATION 

 

 

 
Model: 

 

 
Serial number: 

 

 
Installation date of the electric boiler: 

 

 
Service telephone # – Day: 

 

 
Night: 

 

 
Dealer name and address: 

 

 
 
 
 

Содержание HYDRA COMPACT HYDRAC03-M2401M

Страница 1: ...ontr les Appeler un technicien qualifi INSTALLATEUR TECHNICIEN Utiliser les renseignements dans ce manuel pour l installation et l entretien de l appareil et garder le document pr s de l unit pour r f...

Страница 2: ...ipement doivent tre adress es l entreprise o l achat fut effectu Lorsque toutes les tapes d installation auront t compl t es remettre ce manuel dans son enveloppe originale et la conserver pr s de la...

Страница 3: ...r voir une porte ou un panneau d montable en fa ade pour l acc s au panneau contr le 1 6 SYST ME DE DISTRIBUTION Le bon fonctionnement de votre syst me de chauffage d pend directement de la qualit d i...

Страница 4: ...re et l alimentation d eau du b timent b 1 r servoir d expansion pr pressuris 12 lb po2 de dimension appropri e c 1 ou des purgeurs d air automatique d 1 ou des pompes circulatoires de capacit ad qua...

Страница 5: ...u Le dimensionnement des conducteurs doit tre fait en respect de la derni re dition des codes locaux ou nationaux Ne pas se conformer cette r gle pourrait entra ner des dommages corporels la mort et o...

Страница 6: ...urer que la temp rature ambiante o est install l appareil ne d passe pas 27 C 80 F AVERTISSEMENT La n gligence de faire r parer une fuite du syst me le fait d utiliser la chaudi re comme source d appr...

Страница 7: ...exp dition 2 25 3 3 9 4 12 5 12 15 6 0 81 1 08 3 4 4 12 5 16 7 15 6 20 9 1 08 1 44 3 75 5 5 15 6 20 8 19 5 26 1 35 1 81 4 5 6 3 3 18 8 25 0 23 5 31 3 1 63 2 17 5 25 7 4 3 21 9 29 2 27 4 36 5 1 90 2 5...

Страница 8: ...8 Figure 4 Sch ma type d une installation une zone Figure 5 Diagramme multizone avec plus d un circulateur...

Страница 9: ...9 Figure 6 Diagramme multizone avec valves motoris es Figure 7 Diagramme lectrique...

Страница 10: ...10 SECTION 6 PI CES DE REMPLACEMENT Figure 8 Vue explos e...

Страница 11: ...RE 1 ELEMENT Chaudi re seulement 14 B03977 02 ASS CHAUDI RE 2 ELEMENTS Chaudi re seulement 15 R02L006 THERMOMANOMETRE 1 4 NPT 16 B03984 01 ASS COUVERCLE Comprend couvercle cosmetique et diagramme lect...

Страница 12: ......

Страница 13: ...ner s Manual Dettson Industries Inc Manufactured by 3400 Industrial Boulevard Sherbrooke Qc Canada J1L 1V8 Attention Do not tamper with the unit or its controls Call a qualified service technician Pri...

Страница 14: ...y where the equipment was purchased Upon completion of the installation this manual should be placed back into its original envelope and kept near the boiler for future reference 1 3 DELIVERY Upon del...

Страница 15: ...an enclosure provide a door or a removable panel in front to access the control panel 1 6 DISTRIBUTION SYSTEM The proper functioning of your heating system is directly related to the quality of the pl...

Страница 16: ...n water supply in the building b 1 expansion tank pre pressurized to 12 psi and of appropriate size c 1 or more automatic air purge valves d 1 or more circulating pumps of appropriate capacity CAUTION...

Страница 17: ...hen using 208V change the connector s position at the primary of the transformer Refer to the boiler nameplate and the technical specifications in this manual to select the proper breaker and wire siz...

Страница 18: ...nit is installed does not exceed 27o C 80o F CAUTION The boiler guaranty may be invalidated if water leaks in the system are not repaired the boiler is used as a source of domestic hot water or a sign...

Страница 19: ...5 3 3 9 4 12 5 12 15 6 0 81 1 08 3 4 4 12 5 16 7 15 6 20 9 1 08 1 44 3 75 5 5 15 6 20 8 19 5 26 1 35 1 81 4 5 6 3 3 18 8 25 0 23 5 31 3 1 63 2 17 5 25 7 4 3 21 9 29 2 27 4 36 5 1 90 2 53 6 8 4 4 25 33...

Страница 20: ...8 Figure 4 Typical Diagram of a Single Zone Installation Figure 5 Multizone Diagram with more than one Circulator...

Страница 21: ...9 Figure 6 Multizone diagram with Motorized Valves Figure 7 Electrical Diagram...

Страница 22: ...10 SECTION 6 REMPLACEMENT PARTS Figure 8 Exploded Vue...

Страница 23: ...LER ASSEMBLY 1 ELEMENT Boiler only 14 B03977 02 BOILER ASSEMBLY 2 ELEMENTS Boiler only 15 R02L006 TRIDICATOR 1 4 NPT 16 B03984 01 COVER ASSEMBLY Cover cosmetic and wiring diagram included 17 B04000 02...

Страница 24: ......

Отзывы: