3
Figure 1 : Mounting configurations
1.5)
CLEARANCES
The following clearances should be provided for the servicing of the
unit:
Table 1
Minimum clearances to combustible materials
LOCATION
CLEARANCE
Access side to elements
13 ¼‘’ (34 cm)
Sides
4’’ (10 cm)
Bottom (water connections)
6 5/8’’ (17 cm)
Front*
0
Back
0
* If the boiler is in an enclosure, provide a door or a removable panel
in front to access the control panel.
1.6)
DISTRIBUTION SYSTEM
The proper functioning of your heating system is directly related to
the quality of the plumbing installation. Therefore, the entire
installation must be performed by qualified technicians.
See Figure 2 for the functions of the various boiler components.
The heating system must be set-up to operate at a maximum
pressure of 28 psi and the operating temperature may range from
21
o
C to 88
o
C (70
o
F to 190
o
F).
Содержание HYDRA COMPACT HYDRAC03-M2401M
Страница 9: ...9 Figure 6 Diagramme multizone avec valves motoris es Figure 7 Diagramme lectrique...
Страница 10: ...10 SECTION 6 PI CES DE REMPLACEMENT Figure 8 Vue explos e...
Страница 12: ......
Страница 21: ...9 Figure 6 Multizone diagram with Motorized Valves Figure 7 Electrical Diagram...
Страница 22: ...10 SECTION 6 REMPLACEMENT PARTS Figure 8 Exploded Vue...
Страница 24: ......