![Dettson AMP1-IE2 Скачать руководство пользователя страница 44](http://html1.mh-extra.com/html/dettson/amp1-ie2/amp1-ie2_installation-instructions-and-homeowners-manual_2488145044.webp)
13
When thermostat is satisfied, the burner blower
continues to run during a post purge period
determined by the switch positions on the control (see
the instruction on the control for post purge period
adjustment).
The SCS is approved with a zero post
purge period, but the installer can use a short
post purge period.
A short post purge is
recommended because the AFUE efficiency
decreases with the augmentation of post purge period.
For pump purge cycle, interrupt function, cad cell
resistance check and other features refer to the R7184
instruction manual.
PART 3
MAINTENANCE
This furnace should never be operated without air
filter. Disposable filters should be replaced at least
once a year. If equipped to provide cooling, filters
should be replaced a minimum of twice a year.
To avoid personal injury, make sure the electrical
supply power is “OFF” before servicing.
WARNING
Before performing any service functions,
unless operations specifically require the
power to be on make sure all utilities are
turned “OFF” upstream of the appliance.
Failure to comply with this warning will cause
a fire hazard and/or bodily harm.
For optimum performance, the oil burner nozzle
should be replaced at least once a year. Contact your
dealer serviceman if you are unsure of this procedure.
The procedure for nozzle installation and/or
replacement is outlined in the oil burner instruction
manual which came with the furnace.
After replacement of the nozzle, the burner should be
adjusted in accordance with the “COMBUSTION
CHECK” section of the instructions.
1)
HEAT EXCHANGER CLEANING
Ordinarily, it is not necessary to clean the heat
exchanger or flue pipe every year, but it is advisable
to have your oil burner serviceman check the unit
before each heating season to determine whether
cleaning or replacement of parts is necessary.
If cleaning is necessary, the following steps should be
performed:
1. Turn “OFF” all utilities upstream of the furnace.
2. Disconnect the flue pipe. For sealed combustion
system (SCS) do not disconnect the flue pipe,
only remove the breech plate.
3. Remove the radiator baffle.
4. Disconnect the oil line and remove the oil burner
from the furnace.
5. Open the two cleanout doors located in the upper
part of the front panel of the warm air furnace.
6. Clean the secondary tubes and the primary
cylinder whit stiff brush and vacuum cleaner.
7. Before reassembly, the heat exchanger and
combustion chamber should be inspected to
determine if replacement is required.
8. After cleaning, replace the radiator baffle, flue
collar plate, oil burner and close the two clean out
access doors. Reconnect the flue pipe and oil line.
9. Readjust burner for proper operation.
2)
BLOWER REMOVAL
To remove the blower from the furnace:
1. Turn “OFF” all utilities upstream of the furnace.
2. Remove the burner access door and blower door.
3. Remove the blower retaining screw (on the blower
partition panel).
Содержание AMP1-IE2
Страница 20: ...FIGURE 6 1 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 br leur Beckett 21 DNS 0635 R v A...
Страница 21: ...FIGURE 6 2 Diagramme lectrique AMP2 IE2 LBM120 BMF 125 br leur Beckett 22 DNS 0636 R v A...
Страница 22: ...FIGURE 6 3 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 br leur Riello 23 DNS 0633 R v A...
Страница 23: ...FIGURE 6 4 Diagramme lectrique AMP2 IE2 LBM120 BMF 125 br leur Riello 24 DNS 0634 R v A...
Страница 26: ...FIGURE 6 7 Diagramme lectrique AMP1 IE2 LBM090 BMF 090 br leur B SCS 27 DNS 0643 R v A...
Страница 27: ...FIGURE 6 8 Diagramme lectrique AMP2 IE2 LBM120 BMF 125 br leur B SCS DNS 0644 R v A 28...
Страница 50: ...19 FIGURE 6 1 Wiring diagram AMP1 IE2 LBM090 BMF 090 Beckett burner DNS 0488 Rev B...
Страница 51: ...20 FIGURE 6 2 Wiring diagram AMP2 IE2 LBM120 BMF 125 Beckett burner DNS 0489 Rev B...
Страница 52: ...21 FIGURE 6 3 Wiring diagram AMP1 IE2 LBM090 BMF 090 Riello burner DNS 0405 Rev B...
Страница 53: ...22 FIGURE 6 4 Wiring diagram AMP2 IE2 LBM120 BMF 125 Riello burner DNS 0406 Rev B...
Страница 56: ...FIGURE 6 7 Wiring diagram AMP1 IE2 LBM090 BMF 090 B SCS burner 25 DNS 0641 Rev A...
Страница 57: ...FIGURE 6 8 Wiring diagram AMP2 IE2 LBM120 BMF 125 B SCS burner 26 DNS 0642 Rev A...
Страница 58: ...PARTS LIST Model AMP1 IE2 LBM090 BMF 090 27 Serial number higher than 172980 or S0598V04041 DNS 0187 Rev F...
Страница 60: ...PARTS LIST Model AMP2 IE2 LBM120 BMF 125 29 Serial number higher than 173130 or S0698V04191 DNS 0348 Rev F...